Part A

125 marks
a

What are the main items of work?

2 marks

Answer

Main items of work include earthwork excavation, concrete work (foundation and superstructure), brickwork or masonry, woodwork (doors and windows), steel reinforcement, plastering, flooring, and finishing works like painting and white washing.

b

What are the main methods of building estimate?

3 marks

Answer

The two main methods used for building estimates are:

  • Long wall and short wall method
  • Center line method
c

What is lead in earthwork of canal works?

2 marks

Answer

Sign in to view the complete answer paper.

d

What is the area of side sloping surface (s) on both sides of road having length (L)?

3 marks

Answer

Sign in to view the complete answer paper.

e

What is a work over head charge?

2 marks

Answer

Sign in to view the complete answer paper.

f

What is significance of standard schedule of rates?

3 marks

Answer

Sign in to view the complete answer paper.

g

What is length of main straight bar in a beam?

2 marks

Answer

Sign in to view the complete answer paper.

h

Explain item rate contract.

3 marks

Answer

Sign in to view the complete answer paper.

i

What is capitalized value?

2 marks

Answer

Sign in to view the complete answer paper.

j

What is difference between second class brickwork and third class brick work?

3 marks

Answer

Sign in to view the complete answer paper.

Part B

2

Estimate quantities for a medium income group house (MIG) using centre line method a) earthwork in excavation b) lime concrete in foundation c) 1st class brickwork in superstructure d) plastering. Assume suitable data.

10 marks

Answer

Sign in to view the complete answer paper.

OR
3

Explain in detail about approximate methods of estimating.

10 marks

Answer

Sign in to view the complete answer paper.

4

Prepare a detailed estimate for earth work for a portion of a road from the following data. The formation level at starting point is 119m. Formation width of road is 7.5m and side slopes of banking are 2:1. The road is in downward gradient of 1 in 160 up to 180m and then the gradient changes to 1 in 120 downward.

10 marks

Answer

Sign in to view the complete answer paper.

OR
5

Explain estimation of earthwork in irrigation channels for different cases in a detailed manner?

10 marks

Answer

Sign in to view the complete answer paper.

6

Prepare analysis of rates for the following item of work. 12mm thick plastering of 1:6 cement mortar – unit 1 cu. m. Assume materials and labors at the market rate.

10 marks

Answer

Sign in to view the complete answer paper.

OR
7

Prepare analysis of rates for the following item of work. 1st class brick work in superstructure of 1:3 lime cement mortar – unit 1 cu. m. Assume materials and labors at the market rate.

10 marks

Answer

Sign in to view the complete answer paper.

8

Estimate the quantity of steel for any type of RCC slab with an illustrative example and explain the importance of bar bending schedule?

10 marks

Answer

Sign in to view the complete answer paper.

OR
9

Explain process of tendering contract for public work.

10 marks

Answer

Sign in to view the complete answer paper.

10

Explain the following terms: a) Scrap value. b) Market value. c) Book values. d) Annuity.

10 marks

Answer

Sign in to view the complete answer paper.

OR
11

Explain detailed specifications of Ist class in brickwork.

10 marks

Answer

Sign in to view the complete answer paper.

About this paper

This page contains the question paper of ESTIMATING AND COSTING from JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD for B.Tech CEE IV I, November/December - 2018, R15.

For the solved question paper with answers, switch to the Answer Paper tab.

Other papers in ESTIMATING AND COSTING

Loading Question Papers

Fetching data from database...