JNTU

JNTU B.Tech IV ADVANCED UNDERGROUND COAL MINING TECHNOLOGY Previous Question Paper (July/August - 2022 - R16)

B.Tech | IV | IV-II | R16 | July/August - 2022

Answer PaperPaper Code: 138AMMaximum Marks: 75Time: 3 Hours

Answer any five questions

All questions carry equal marks

Main

115 marks
a

What are the factors which determine the mine size?

7 marks

Answer

The size of a coal mine is determined by a balance between geological, technical, and economic factors. Key considerations include:

  • Geological Reserves: The total quantity, quality, and spatial distribution of the coal seam dictate the maximum potential output and the physical limits of the mine.
  • Production Capacity: The capacity of the mining equipment and the selected extraction method (e.g., longwall vs. room and pillar) define the daily and annual output rates.
  • Market Demand: The size is constrained by the existing and projected demand for coal, including long-term supply contracts and market volatility.
  • Infrastructure and Logistics: The availability and capacity of transport systems (rail, conveyor, or road) to move coal from the mine to the end-user limit the scale of operations.
  • Capital Availability: The initial investment required for development and the ability to secure financing influence the scale of the mine design.
  • Regulatory and Environmental Constraints: Legal requirements, land acquisition, and environmental impact assessments often dictate the maximum permissible production rate or the physical footprint of the mine.
b

Explain about the process of determining the optimal life of a mine.

8 marks

Answer

The optimal life of a mine is determined by finding the point where the present value of the project is maximized, balancing the rate of extraction against the total available reserves. The process involves:

  1. Estimation of Reserves: Conduct a thorough geological survey to determine the total mineable coal reserves available for extraction.
  2. Cash Flow Analysis: Develop a detailed financial model projecting annual revenues and operating costs over the life of the mine. This includes accounting for capital expenditure (CAPEX) and operating expenditure (OPEX).
  3. Discounting Future Cash Flows: Apply a discount rate to future earnings to calculate the Net Present Value (NPV). The formula used is:
    NPV = Σ [R_t - C_t] / (1 + i)^t
    where R is revenue, C is cost, i is the discount rate, and t is the year.
  4. Sensitivity Analysis: Evaluate how changes in coal prices, extraction costs, and discount rates affect the NPV.
  5. Optimization: Compare different production scenarios. A higher production rate shortens the mine life but increases the NPV due to the time value of money, whereas a lower rate extends the life but may reduce the overall profitability. The optimal life is the duration that yields the highest NPV while remaining technically feasible and operationally sustainable.
215 marks
a

What information is required for opening out a mine by surface drifts?

7 marks

Answer

Sign in to view the complete answer paper.

b

Explain the different stages of Planning of new Mines.

8 marks

Answer

Sign in to view the complete answer paper.

315 marks
a

What are the factors governing the selection of equipment for development of a coal seam?

7 marks

Answer

Sign in to view the complete answer paper.

b

Explain with a neat sketch the layout of a Bord & Pillar panel using LHDs.

8 marks

Answer

Sign in to view the complete answer paper.

415 marks
a

What are the limitations of Bord & Pillar method?

7 marks

Answer

Sign in to view the complete answer paper.

b

Explain the statutory provisions with respect to the Bord and pillar development.

8 marks

Answer

Sign in to view the complete answer paper.

515 marks
a

Describe the problems in extraction of pillars.

7 marks

Answer

Sign in to view the complete answer paper.

b

What are the preparatory arrangements to be provided before pillar extraction?

8 marks

Answer

Sign in to view the complete answer paper.

6

A coal seam having the following parameters.

Seam thickness : 4.5 m

Gradient : 1 in 8

Depth : 250 m

Suggest a suitable method of extraction of pillars mentioning the requirement of equipment, manpower, method of supporting, manner of extraction and rate of extraction. Assume other conditions.

15 marks

Answer

Sign in to view the complete answer paper.

715 marks
a

Describe the different equipment used in a Longwall panel.

5 marks

Answer

Sign in to view the complete answer paper.

b

Draw neat sketch of a Longwall panel.

5 marks

Answer

Sign in to view the complete answer paper.

c

What are the problems associated in a Longwall Panel during development and depillaring?

5 marks

Answer

Sign in to view the complete answer paper.

815 marks
a

Calculate the production and productivity per day from a Long wall face with the following data for 300 workings in a year:

Panel Length : 2800 m

Face Length : 250 m

Height of Extraction : 3.3 m

Sp Gravity of Coal : 1.5 kg/m3

No of cuts per day : 8

Manpower deployed : 120 per day

10 marks

Answer

Sign in to view the complete answer paper.

b

Write the organization chart of a Mechanized Long Wall Mine?

5 marks

Answer

Sign in to view the complete answer paper.

About this paper

This page contains the solved question paper with answers of ADVANCED UNDERGROUND COAL MINING TECHNOLOGY from JNTU for B.Tech ME IV IV-II, July/August - 2022, R16.

For the question paper without answers, switch to the Question Paper tab.

Loading Question Papers

Fetching data from database...