JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD

JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD B.Tech IV MINE PLANNING AND DESIGN Previous Question Paper (July/August - 2022 - R18)

B.Tech | IV | IV-II | R18 | July/August - 2022

Answer PaperPaper Code: 158BTMaximum Marks: 75Time: 3 Hours

Answer any five questions

All questions carry equal marks

Main

1

Explain in detail the factors to be considered for long range planning for an underground metal mining project. Assume relevant data, wherever necessary.

15 marks

Answer

Long-range planning for an underground metal mining project is a strategic process spanning the entire life of the mine, typically 10 to 20 years or more. The primary objective is to optimize the extraction sequence to ensure economic viability, safety, and resource conservation. The key factors to be considered are:

  1. Geological and Resource Factors: Comprehensive understanding of the ore body geometry, grade distribution, and rock mass characteristics is essential. This includes defining the mineral reserve classification (proven, probable), structural geology (faults/folds), and hydrogeological conditions that dictate mining methods and support requirements.
  2. Mining Method Selection: Based on the ore body's dip, thickness, and rock strength, the method (e.g., Cut and Fill, Sublevel Stoping, or Block Caving) must be selected to maximize recovery and minimize dilution. The plan must account for the transition between methods if the ore body characteristics change with depth.
  3. Production Scheduling and Sequencing: Long-range plans define the annual production targets. The sequence of extraction must ensure consistent ore grade delivery to the mill, considering the development-to-stoping ratio and the need for multiple active production fronts to mitigate operational risks.
  4. Infrastructure and Access: Planning the location and capacity of primary access points, such as shafts, declines, and main haulage levels. This includes ventilation requirements, compressed air, water supply, and power distribution networks that must scale with the mine's expansion.
  5. Economic and Financial Parameters: Integration of capital expenditure (CAPEX) for development and equipment, and operating expenditure (OPEX) for labor, energy, and maintenance. Sensitivity analysis on metal prices, inflation, and discount rates is critical to determine the Cut-off Grade (COG) over the project life.
  6. Environmental and Social Governance (ESG): Planning for waste rock management, tailings disposal, and mine closure. Long-range plans must incorporate reclamation strategies and ensure compliance with regulatory standards throughout the mine life.
  7. Technological Integration: Incorporating automation, digitalization, and electrification strategies that may be phased in over the life of the mine to improve safety and productivity.

For a hypothetical project with an annual production of 1 million tonnes, the planning must ensure that development rates (e.g., 500 meters of lateral development per month) are maintained at least 18 months ahead of production to prevent bottlenecks. The plan should be reviewed every 3-5 years to adjust for geological surprises or market volatility.

2

What are the optimization techniques commonly used in mine planning? Explain any one optimization technique in detail, giving it’s applicability and limitations.

15 marks

Answer

Optimization techniques in mine planning are essential for maximizing economic returns while adhering to geological, geotechnical, and operational constraints. Common techniques include:

  • Lerchs-Grossmann (LG) Algorithm: A graph-theory based approach for determining the optimal open pit limit.
  • Floating Cone Algorithm: A heuristic method for pit optimization by iteratively removing cones of material.
  • Dynamic Programming: Used for optimizing production scheduling and cut-off grade strategies.
  • Mixed Integer Linear Programming (MILP): Used for complex mine scheduling and equipment allocation problems.
  • Genetic Algorithms and Metaheuristics: Applied to solve non-linear, multi-objective optimization problems in mine design.

The Lerchs-Grossmann Algorithm is the industry standard for determining the ultimate pit limit. It models the orebody as a 3D block model where each block is assigned a net value based on ore grade, mining cost, and processing revenue. The algorithm constructs a directed graph where nodes represent blocks, and arcs represent the physical constraints (precedence) that must be satisfied to mine a specific block. It identifies the maximum weight closure in the graph, representing the pit shell that yields the highest possible profit.

Applicability: It is highly effective for large-scale open-pit mines where geological data is well-defined. It ensures a mathematically optimal solution for the final pit shell, providing a robust basis for long-term strategic planning.

Limitations: The primary limitation is that it is a static, deterministic model that does not account for the time value of money or operational constraints like mining sequence and equipment capacity. Furthermore, it is computationally intensive for very large block models, and it assumes constant costs and prices, which may not reflect market volatility.

3

Discuss on estimation of optimum mill grade and production planning in mines.

15 marks

Answer

Sign in to view the complete answer paper.

4

Explain in detail, the factors to be considered for mine closure planning of a opencast coal mine project. Assume relevant data, if necessary.

15 marks

Answer

Sign in to view the complete answer paper.

5

Explain the methodology for design of coal pillar in an underground coal mine. Assume relevant data, wherever necessary.

15 marks

Answer

Sign in to view the complete answer paper.

6

What are the factors to be considered for selection of stoping method? Explain each in detail.

15 marks

Answer

Sign in to view the complete answer paper.

715 marks
a

Performance monitoring and expert systems.

8 marks

Answer

Sign in to view the complete answer paper.

b

Maintenance planning and scheduling.

7 marks

Answer

Sign in to view the complete answer paper.

8

What are parameters to be considered for environmental impact assessment for opencast mines? Explain each in detail.

15 marks

Answer

Sign in to view the complete answer paper.

About this paper

This page contains the solved question paper with answers of MINE PLANNING AND DESIGN from JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD for B.Tech ME IV IV-II, July/August - 2022, R18.

For the question paper without answers, switch to the Question Paper tab.

Loading Question Papers

Fetching data from database...