What are the different equipment used in Continuous Miner Technology?
Answer
Continuous Miner (CM) technology relies on a coordinated system of machinery to ensure high-productivity coal extraction. The primary equipment includes:
- Continuous Miner Machine: The core unit equipped with a rotating cutter head that shears coal and loads it onto an integral conveyor.
- Shuttle Cars: Battery or cable-reel powered vehicles that transport coal from the CM discharge conveyor to the feeder breaker.
- Feeder Breaker: A mobile unit that receives coal from shuttle cars, breaks down large lumps, and regulates the flow onto the section belt conveyor.
- Roof Bolters: Independent machines used for systematic roof support installation immediately following the CM advance.
- Section Belt Conveyor: The primary haulage system that transports coal from the feeder breaker to the main trunk conveyor system.
- Ventilation and Dust Control: Auxiliary fans with flexible ducting and water spray systems integrated into the CM to manage methane and respirable dust.
Explain the method of development of 3 m thick coal seam with 6m × 3m gallery dimension using Continuous Miner Technology.
Answer
The development of a 3 m thick coal seam using Continuous Miner technology follows a systematic room-and-pillar layout, typically utilizing a multi-heading system (e.g., 5 to 7 headings) to ensure continuous production.
- Layout Design: Galleries are driven at 6 m width with a 3 m height, maintaining pillar sizes based on depth and strata control requirements. The CM advances in a specific sequence across the headings to allow for cycle time optimization.
- Cutting Cycle: The CM cuts the coal face in a 'sump and shear' sequence. It sumps into the face at the floor level, then shears upward to the roof to maintain the 3 m height.
- Haulage Coordination: Two shuttle cars operate in a 'shuttle' pattern, where one car is loaded by the CM while the other travels to the feeder breaker, ensuring the CM does not wait for transport.
- Roof Support: As the CM retreats from a face after reaching the designated cut depth (usually 6-10 m), the roof bolting machine enters the area to install primary support (roof bolts) before the next cut begins.
- Ventilation: Line brattice or auxiliary ventilation ducting is extended after every cut to ensure fresh air reaches the face, keeping methane concentrations within safe limits.
- Sequence of Advance: The CM moves between headings in a predetermined order to balance the distance traveled by shuttle cars and to allow sufficient time for bolting crews to secure the roof in previously cut headings.
Explain Raising by long hole drilling.
Answer
Sign in to view the complete answer paper.
Explain two compartment method of rising.
Answer
Sign in to view the complete answer paper.
Explain in detail the mine development for working of vein and lode deposits.
Answer
Sign in to view the complete answer paper.
What problems would be encountered while extracting a coal seam above an already existing caved goaf?
Answer
Sign in to view the complete answer paper.
Explain the principles of Pillar extraction techniques.
Answer
Sign in to view the complete answer paper.
Explain the systematic support rules with simple sketches and layout for depillaring with caving using LHDs for extraction of 2.8 m thick coal seam.
Answer
Sign in to view the complete answer paper.
What are the conditions suitable for cut and fill method of stoping?
Answer
Sign in to view the complete answer paper.
Explain cut and fill stoping.
Answer
Sign in to view the complete answer paper.
What are the advantages of Room and Pillar?
Answer
Sign in to view the complete answer paper.
Explain Block caving method of stoping.
Answer
Sign in to view the complete answer paper.
Explain the manner of extraction of a pillar in Board and Pillar method to extract a seam of 4.5m thick by giving simple sketches. Assume your own conditions.
Answer
Sign in to view the complete answer paper.