JNTU B.Tech III MINE SYSTEMS ENGINEERING Previous Question Paper (May - 2019 - R16)
Note: This question paper contains two parts A and B. Part A is compulsory which carries 25 marks. Answer all questions in Part A. Part B consists of 5 Units. Answer any one full question from each unit. Each question carries 10 marks and may have a, b, c as sub questions.
Part A
What do you understand by a Linear programming Problem?
Answer
A Linear Programming Problem (LPP) is a mathematical optimization technique used to determine the best outcome in a model whose requirements are represented by linear relationships. It involves maximizing or minimizing a linear objective function subject to a set of linear equality or inequality constraints.
List the classification of Operation Research Models.
Answer
Operations Research models are classified as follows:
- Deterministic models
- Probabilistic (Stochastic) models
- Static models
- Dynamic models
- Linear and Non-linear models
- Simulation models
What is Assignment problem?
Answer
Sign in to view the complete answer paper.
What is MODI method?
Answer
Sign in to view the complete answer paper.
State the pre-requisites for solving a “3-machine n, Job” Sequencing problem.
Answer
Sign in to view the complete answer paper.
Explain the O.R Methodology of solving replacement problems.
Answer
Sign in to view the complete answer paper.
What are the different types of inventory in industries?
Answer
Sign in to view the complete answer paper.
Explain the benefits of inventory control.
Answer
Sign in to view the complete answer paper.
Explain the phases of simulation.
Answer
Sign in to view the complete answer paper.
List the purpose of CPM and PERT for Project Management.
Answer
Sign in to view the complete answer paper.
Part B
What are the basic characteristics of a Linear Programming Model?
Answer
Sign in to view the complete answer paper.
Solve graphically the following linear programming problem. Maximize Z = 5X1+3X2 Subject to 3X1+X2 ≤ 12, X1+2X2 ≤ 14, X1+X2 ≤ 8, X1, X2 ≥0
Answer
Sign in to view the complete answer paper.
Solve graphically the following Linear Program: Maximize Z=3X1+5X2 Subject to X1≤4, X2≤5 And 5X1+4X2 ≤ 30 X1≥0, X2≥0
Answer
Sign in to view the complete answer paper.
The assignment problem given requires four different jobs to be done on four different machines. Calculate the minimum cost of assignment.
| Job | M1 | M2 | M3 | M4 |
| J1 | 27 | 35 | 36 | 30 |
| J2 | 33 | 37 | 36 | 35 |
| J3 | 30 | 26 | 28 | 24 |
| J4 | 38 | 29 | 35 | 33 |
Answer
Sign in to view the complete answer paper.
The assignment problem given requires four different job to be done on four different machines. Calculate the minimum cost of Assignment.
| JOB | M1 | M2 | M3 | M4 |
| J1 | 27 | 35 | 36 | 30 |
| J2 | 33 | 37 | 36 | 35 |
| J3 | 30 | 26 | 28 | 24 |
| J4 | 38 | 29 | 35 | 33 |
Answer
Sign in to view the complete answer paper.
Enumerate the important assumptions made in sequencing problems.
Answer
Sign in to view the complete answer paper.
An electric generator costs Rs.2,00,000, Operating and maintenance costs are Rs.10,000 per year for the first five years. In the sixth and the subsequent years these costs increase by Rs.2,000 each year. Assuming 10% cost of money per year, find the Optimum length of time to keep the machine before replacing it?
Answer
Sign in to view the complete answer paper.
Explain with examples failure mechanism of items.
Answer
Sign in to view the complete answer paper.
What is replacement? Describe some important replacement situations and replacement policies.
Answer
Sign in to view the complete answer paper.
How is the concept of Dominance used in simplifying the solution of a rectangular game?
Answer
Sign in to view the complete answer paper.
Explain the relevant cost for inventory decisions.
Answer
Sign in to view the complete answer paper.
Discuss step by step the development of EOQ formula.
Answer
Sign in to view the complete answer paper.
Describe the role of “Theory of games” for scientific decision making.
Answer
Sign in to view the complete answer paper.
Customers arrive at the rate of twenty per hour and the present serving arrangements can cope with thirty per hour for an eight-hour day .What is the average time in the queue?
Answer
Sign in to view the complete answer paper.
Develop a network diagram for the project specified below.
| Activity | Immediate Predecessor Activity |
| A | ----- |
| B | A |
| C,D | B |
| E | C |
| F | D |
| G | E,F |
Answer
Sign in to view the complete answer paper.
What do you understand by a waiting line model?
Answer
Sign in to view the complete answer paper.
Draw the Network Diagram:
| Activity | Description | Immediate Predecessor | Duration |
| A | Receive raw materials | ----- | 0.5 |
| B | Bolt cutting | A | 1.0 |
| C | Transfer Machine | ----- | 1.5 |
| D | Transfer Machine | ----- | 1.4 |
| E | Barrel pinning | D | 1.2 |
| F | Shackle groove cutting | B | 0.8 |
| G | Shackle bending | F | 1.0 |
| H | Insert shackle into body | C,E,G | 0.4 |
| I | Insert barrel into body | H | 1.4 |
| J | Packaging of padlock | I | 0.5 |
Answer
Sign in to view the complete answer paper.