Jawaharlal Nehru Technological University Hyderabad

Jawaharlal Nehru Technological University Hyderabad B.Tech IV PLANNING OF UNDERGROUND COAL MINING PROJECT Previous Question Paper (February/March - 2022 - R16)

B.Tech | IV | I | R16 | February/March - 2022

Answer PaperPaper Code: 137FNMaximum Marks: 75Time: 3 Hours

Answer any Five Questions. All Questions Carry Equal Marks.

Main

1
Explain the following terms related to mine planning.
15 marks
a
Feasibility report
5 marks

Answer

A Feasibility Report is a comprehensive technical and economic document prepared to determine the viability of a mining project. It is based on detailed exploration data, including geological modeling, reserve estimation, and geotechnical studies. The report evaluates the selection of mining methods, infrastructure requirements, equipment procurement, and environmental impact assessments. It provides a detailed financial analysis, including Capital Expenditure (CAPEX), Operational Expenditure (OPEX), Internal Rate of Return (IRR), and Net Present Value (NPV), serving as the primary document for investment approval and project sanctioning.
b
Pre-feasibility report
5 marks

Answer

A Pre-feasibility Report is an intermediate study conducted to assess whether a project warrants a full feasibility study. It provides a preliminary evaluation of the technical and economic aspects based on available data, often with a lower level of confidence than a final feasibility report. Its primary purpose is to identify critical constraints, potential fatal flaws, and the range of economic viability, thereby helping management decide whether to proceed with further exploration or more detailed engineering designs.
c
Master Plan.
5 marks

Answer

Sign in to view the complete answer paper.

2
What are the factors to be considered before designing a mine plan? Explain.
15 marks

Answer

Sign in to view the complete answer paper.

3
Explain how do you classify a coal reserve and how can you estimate a coal reserve? Discuss.
15 marks

Answer

Sign in to view the complete answer paper.

4
What are the factors to be considered in designing a shaft pillar? Explain.
15 marks

Answer

Sign in to view the complete answer paper.

5
Explain the design of extraction of coal with a continuous miner. Explain the ancillary equipment to be used with continuous miner.
15 marks

Answer

Sign in to view the complete answer paper.

6
Differentiate Load Haul Dumper and Side Discharging Loader in its operation and extraction and maintenance with a neat sketch.
15 marks

Answer

Sign in to view the complete answer paper.

7
What is a Gate Roadway? Explain how do you design gate road ways in Longwall Mining.
15 marks

Answer

Sign in to view the complete answer paper.

8
What are thick seams? Explain how do you classify thick seams? What are different methods are available to extract thick seams?
15 marks

Answer

Sign in to view the complete answer paper.

About this paper

This page contains the solved question paper with answers of PLANNING OF UNDERGROUND COAL MINING PROJECT from Jawaharlal Nehru Technological University Hyderabad for B.Tech MNE-MIE IV I, February/March - 2022, R16.

For the question paper without answers, switch to the Question Paper tab.

Other papers in PLANNING OF UNDERGROUND COAL MINING PROJECT

Loading Question Papers

Fetching data from database...