Jawaharlal Nehru Technological University Hyderabad
Jawaharlal Nehru Technological University Hyderabad B.Tech III DRILLING TECHNOLOGY Previous Question Paper (October - 2020 - R15)
Answer any five questions. All questions carry equal marks.
Main
What is the role of drilling in field development?
Answer
Drilling is the fundamental process in field development, serving as the primary bridge between subsurface exploration and commercial hydrocarbon production. Its role encompasses several critical functions:
- Exploration and Appraisal: Drilling exploratory wells confirms the presence of hydrocarbons, while appraisal wells determine the size, extent, and commercial viability of the reservoir.
- Data Acquisition: Drilling provides essential access to the reservoir, allowing for the collection of core samples, well logs, and formation pressure data, which are vital for characterizing the field.
- Production Access: Development wells are drilled to establish a permanent conduit between the reservoir and the surface, enabling the controlled extraction of oil and gas.
- Field Management: Drilling includes the placement of injection wells for pressure maintenance (water or gas injection) and observation wells to monitor reservoir performance over time.
- Economic Realization: By optimizing well placement and trajectory, drilling maximizes the recovery factor and ensures the economic feasibility of the entire field development project.
Write the classification of well. Write about the Rig Crew.
Answer
Wells are classified based on their purpose and trajectory. The primary classifications include:
- Exploration Wells: Drilled to discover new hydrocarbon accumulations in unproven areas.
- Appraisal Wells: Drilled to define the limits and characteristics of a discovered reservoir.
- Development Wells: Drilled within a proven field to extract hydrocarbons.
- Service Wells: Includes injection wells (for pressure maintenance) and disposal wells.
- Directional/Horizontal Wells: Classified by their trajectory, where the wellbore is deviated from the vertical to reach specific targets or increase reservoir exposure.
The Rig Crew is the specialized team responsible for the safe and efficient operation of the drilling rig. Key personnel include:
- Toolpusher: The overall supervisor of the rig site, responsible for operations, logistics, and safety.
- Driller: Operates the drilling console and controls the drilling parameters; responsible for the immediate safety of the rig floor.
- Derrickman: Works on the monkey board during tripping operations to handle drill pipe and monitors the mud system/pumps.
- Floorhands (Roughnecks): Assist on the rig floor with pipe handling, making up and breaking out connections, and general maintenance.
- Motorman: Maintains the rig's engines, power systems, and mechanical equipment.
Explain about the drilling fluid functions and its types.
Answer
Sign in to view the complete answer paper.
What are the general problems encountered during a cementing operation?
Answer
Sign in to view the complete answer paper.
Write the casing and cementing analysis report.
Answer
Sign in to view the complete answer paper.
Explain in details the Bit Hydraulics and Optimization.
Answer
Sign in to view the complete answer paper.
Explain briefly about Measuring while drilling and logging while drilling.
Answer
Sign in to view the complete answer paper.
Discuss briefly the principles associated with the packed hole, pendulum and fulcrum BHA and when each would be used.
Answer
Sign in to view the complete answer paper.
Explain briefly the deflection tools used in directional drilling.
Answer
Sign in to view the complete answer paper.
Estimate the ECD of the mud and describe the impact of mud weight on lost circulation.
Answer
Sign in to view the complete answer paper.
Explain the briefly one circulation and driller’s method for killing a well.
Answer
Sign in to view the complete answer paper.
Explain in detail the plan for a drilling cuttings waste management.
Answer
Sign in to view the complete answer paper.