JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD

JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD B.Tech III WELL COMPLETIONS Previous Question Paper (April - 2018 - R15)

B.Tech | III | III-II | R15 | April - 2018

Answer PaperPaper Code: 126WFMaximum Marks: 75Time: 3 hours

Note: This question paper contains two parts A and B. Part A is compulsory which carries 25 marks. Answer all questions in Part A. Part B consists of 5 Units. Answer any one full question from each unit. Each question carries 10 marks and may have a, b, c as sub questions.

Part A

125 marks
a

Write the types of wells.

2 marks

Answer

Wells are primarily categorized into exploration wells, appraisal wells, and development wells (which include production and injection wells).

b

What do you understand by completions?

3 marks

Answer

Completion is the process of making a well ready for production or injection after drilling is finished. It involves installing the necessary equipment, such as casing, tubing, packers, and wellhead assemblies, to establish a controlled flow path between the reservoir and the surface.

c

Define term “perforation”.

2 marks

Answer

Sign in to view the complete answer paper.

d

Write the minimum value of perforation diameter.

3 marks

Answer

Sign in to view the complete answer paper.

e

What do you understand by workover?

2 marks

Answer

Sign in to view the complete answer paper.

f

Define term gas shutoff.

3 marks

Answer

Sign in to view the complete answer paper.

g

Write the conventional work over system.

2 marks

Answer

Sign in to view the complete answer paper.

h

Define term “nominal weight of pipe”.

3 marks

Answer

Sign in to view the complete answer paper.

i

How to kill the well?

2 marks

Answer

Sign in to view the complete answer paper.

j

Write the fishing tools.

3 marks

Answer

Sign in to view the complete answer paper.

Part B

210 marks
a

Define the well completion engineering and write the fundamental theory of well completion engineering.

5 marks

Answer

Sign in to view the complete answer paper.

b

Explain open hole and cased hole completions with suitable diagram.

5 marks

Answer

Sign in to view the complete answer paper.

OR
310 marks
a

What are parameters affects the completion design?

5 marks

Answer

Sign in to view the complete answer paper.

b

Write the designing criteria for a successful completion.

5 marks

Answer

Sign in to view the complete answer paper.

410 marks
a

Discuss main parameters affecting the productivity of zone produced by perforating.

5 marks

Answer

Sign in to view the complete answer paper.

b

Explain the tubing-conveyed perforating (TCP) method used in oil and gas fields.

5 marks

Answer

Sign in to view the complete answer paper.

OR
510 marks
a

What do you understand by perforation tunnel? Describe perforating equipment used in oil and gas wells.

5 marks

Answer

Sign in to view the complete answer paper.

b

Write the application of logging equipment used in cased hole.

5 marks

Answer

Sign in to view the complete answer paper.

610 marks
a

Explain the functions and applications of packers used in oil fields.

5 marks

Answer

Sign in to view the complete answer paper.

b

Write the advantages and drawbacks of permanent packers.

5 marks

Answer

Sign in to view the complete answer paper.

OR
710 marks
a

Explain hydraulically and mechanically retrievable packers.

5 marks

Answer

Sign in to view the complete answer paper.

b

Illustrate subsurface controlled safety valve (SSCSV) and surface controlled subsurface safety valve (SCSSV).

5 marks

Answer

Sign in to view the complete answer paper.

810 marks
a

What are parameters considered in tubing string design? Also write the procedure of tubing string design.

5 marks

Answer

Sign in to view the complete answer paper.

b

Write the procedure to running subsurface equipment in a well equipped with a permanent packer.

5 marks

Answer

Sign in to view the complete answer paper.

OR
910 marks
a

Explain nominal diameter and nominal weight of pipe.

5 marks

Answer

Sign in to view the complete answer paper.

b

Elaborate gas lift production tubing string with diagram.

5 marks

Answer

Sign in to view the complete answer paper.

1010 marks
a

What are the reasons for performing workover job in oil and gas well.

5 marks

Answer

Sign in to view the complete answer paper.

b

Write the principle and area of operation of wireline work.

5 marks

Answer

Sign in to view the complete answer paper.

OR
1110 marks
a

Describe the principle and equipment of coiled tubing system.

5 marks

Answer

Sign in to view the complete answer paper.

b

What do you understand by snubbing? Write the principle and area of application of snubbing.

5 marks

Answer

Sign in to view the complete answer paper.

About this paper

This page contains the solved question paper with answers of WELL COMPLETIONS from JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD for B.Tech PTM III III-II, April - 2018, R15.

For the question paper without answers, switch to the Question Paper tab.

Other papers in WELL COMPLETIONS

Loading Question Papers

Fetching data from database...