What do you understand by appraisal well?
Answer
An appraisal well is drilled after a discovery well to evaluate the size, extent, and commercial viability of a hydrocarbon reservoir. It provides critical data on reservoir properties, fluid characteristics, and connectivity to determine if field development is economically feasible.
Explain briefly about relief well drilling.
Answer
Relief well drilling is an emergency procedure used to intersect a blowout well at depth. By drilling a secondary wellbore to reach the target formation, heavy kill fluids can be pumped directly into the blowout well to regain pressure control and stop the uncontrolled flow of hydrocarbons.
What is slip joint?
Answer
Sign in to view the complete answer paper.
Write short note on pulse testing.
Answer
Sign in to view the complete answer paper.
What is the function of packer part ‘cone’?
Answer
Sign in to view the complete answer paper.
Write short note on packer setting mechanism.
Answer
Sign in to view the complete answer paper.
Write down the applications of production tubing.
Answer
Sign in to view the complete answer paper.
Explain about the function of tubing.
Answer
Sign in to view the complete answer paper.
What is the advantage of predrilled liner completion?
Answer
Sign in to view the complete answer paper.
Write short note on well servicing.
Answer
Sign in to view the complete answer paper.
Part B
What is the effect of poor completion design? Explain it.
Answer
Sign in to view the complete answer paper.
Write brief note on overbalanced perforation.
Answer
Sign in to view the complete answer paper.
Describe about API completion selection guide for well.
Answer
Sign in to view the complete answer paper.
Explain different factors which influence well completion design.
Answer
Sign in to view the complete answer paper.
Write brief note on underbalanced perforation.
Answer
Sign in to view the complete answer paper.
Explain briefly about the barefoot completion.
Answer
Sign in to view the complete answer paper.
What is RFT? How will we perform it?
Answer
Sign in to view the complete answer paper.
What do you understand by single zone testing? Explain it.
Answer
Sign in to view the complete answer paper.
Write different functions of tubing fill test valve.
Answer
Sign in to view the complete answer paper.
What is DST? How will we perform it?
Answer
Sign in to view the complete answer paper.
What do you understand by multiple zone testing? Explain it.
Answer
Sign in to view the complete answer paper.
Write different functions of IRIS dual valve.
Answer
Sign in to view the complete answer paper.
Write down the use of different packer parts in brief.
Answer
Sign in to view the complete answer paper.
Which packer is more suitable for gas well and why? Explain it.
Answer
Sign in to view the complete answer paper.
Explain briefly about well head by using neat sketch.
Answer
Sign in to view the complete answer paper.
Write down the purpose of using packer in brief.
Answer
Sign in to view the complete answer paper.
Write down different features of swell packers.
Answer
Sign in to view the complete answer paper.
How do we set packer in the well? Explain the mechanism.
Answer
Sign in to view the complete answer paper.
What are the parameters used to define tubing? Describe those parameters.
Answer
Sign in to view the complete answer paper.
Find out the value of burst and tubing load when the internal and outer pressure of the tubing are 5000 psi and 3500 psi, weight of tubing 4.3 ppf, length of tubing 11000 ft and tension require to set the packer 500 p.
Answer
Sign in to view the complete answer paper.
Write down the most common tubing steel grades. Explain it.
Answer
Sign in to view the complete answer paper.
Find out the erosional velocity when gas gravity is 0.64, liquid gravity is 0.87, operating pressure 4000 psi, gas liquid ratio is 0.45 and temperature is 600 F.
Answer
Sign in to view the complete answer paper.
Explain the parameter drift diameter of tubing characteristics.
Answer
Sign in to view the complete answer paper.
What is HP HT well? When will we consider a well as HP HT?
Answer
Sign in to view the complete answer paper.
Write difference between cased hole completion and open hole completion.
Answer
Sign in to view the complete answer paper.
Write some of the disadvantages of liner and external casing packers in brief.
Answer
Sign in to view the complete answer paper.
What is the advantage of open hole completion? Explain it.
Answer
Sign in to view the complete answer paper.
How is seal failure leads to external casing packer failure? Describe it.
Answer
Sign in to view the complete answer paper.
Write down different steps involved in work over planning in brief.
Answer
Sign in to view the complete answer paper.