What is mooring line?
Answer
A mooring line is a high-strength cable, chain, or synthetic rope system used to secure a floating offshore structure to the seabed, ensuring it remains within a specific station-keeping envelope despite environmental forces like wind, waves, and currents.
Write working principle of Jack up rig.
Answer
A jack-up rig operates by lowering its independent or mat-supported legs to the seabed. Once the legs are firmly established, a jacking system elevates the hull above the water surface to a safe operational height, effectively converting the vessel into a stable, fixed platform.
Define centre of buoyancy.
Answer
Sign in to view the complete answer paper.
Describe dispersion relationship and dynamic pressure.
Answer
Sign in to view the complete answer paper.
What do you understand by catenary bridge?
Answer
Sign in to view the complete answer paper.
Write short notes on wave driven current.
Answer
Sign in to view the complete answer paper.
Define winch and anchor holding power.
Answer
Sign in to view the complete answer paper.
Write short notes on designation of ropes.
Answer
Sign in to view the complete answer paper.
What is riser? Write its types.
Answer
Sign in to view the complete answer paper.
Write short notes on riser clashing.
Answer
Sign in to view the complete answer paper.
Part B
Write short notes on field development using spiral concept.
Answer
Sign in to view the complete answer paper.
Explain about fixed platform with neat sketch.
Answer
Sign in to view the complete answer paper.
Write short notes on novel offshore field development.
Answer
Sign in to view the complete answer paper.
Explain the parameters which are required to develop novel offshore field.
Answer
Sign in to view the complete answer paper.
Explain about Morison’s diagram by drawing neat sketch.
Answer
Sign in to view the complete answer paper.
What is the response of fixed platform against the loads acting on it? Make free body diagram for different loads working on platform.
Answer
Sign in to view the complete answer paper.
What are the challenges to be faced during offshore drilling? Explain.
Answer
Sign in to view the complete answer paper.
Write short notes on ocean water properties.
Answer
Sign in to view the complete answer paper.
Describe about stability criteria of floating platform.
Answer
Sign in to view the complete answer paper.
Find out the meta centric height of floating body when moment of inertia, submerged volume and distance between centre of buoyancy and gravity are 2000 m4, 1200 m3 and 1.2 m.
Answer
Sign in to view the complete answer paper.
Explain about tower type platform in brief with neat diagram.
Answer
Sign in to view the complete answer paper.
Write short notes on different motions encountered in ship shaped vessel with suitable diagram.
Answer
Sign in to view the complete answer paper.
Explain basic catenary equation for mooring line with diagram.
Answer
Sign in to view the complete answer paper.
Write brief notes on turret mooring system. Explain by using diagram.
Answer
Sign in to view the complete answer paper.
Describe about acoustic position referencing system.
Answer
Sign in to view the complete answer paper.
Why is spiral design done in spar platform leg? Explain by using neat sketch.
Answer
Sign in to view the complete answer paper.
Write brief notes on drilling riser? Write its applications.
Answer
Sign in to view the complete answer paper.
What steps to be followed to save offshore platform leg from riser clashing?
Answer
Sign in to view the complete answer paper.
Explain about different VIV suppression devices.
Answer
Sign in to view the complete answer paper.