Answer PaperPaper Code: 137JJMaximum Marks: 75Time: 3 Hours

Answer any five questions. All questions carry equal marks.

Main

115 marks
a

What are the factors influencing completion design? And explain them.

7 marks

Answer

Completion design is a critical process that determines the long-term productivity and integrity of a well. The primary factors influencing this design include:

  • Reservoir Characteristics: Properties such as pressure, temperature, permeability, porosity, and fluid composition (oil, gas, water, or sand content) dictate the selection of completion fluids and sand control methods.
  • Well Geometry and Depth: The trajectory (vertical, deviated, or horizontal) and total depth influence the mechanical design of the casing, tubing, and the ability to deploy tools.
  • Production Rates and Life Expectancy: Expected flow rates determine the required tubing size to minimize pressure drop while maintaining velocity for liquid unloading.
  • Well Stimulation and Intervention Needs: Design must account for future requirements such as acidizing, hydraulic fracturing, or wireline interventions to maintain productivity.
  • Environmental and Safety Regulations: Compliance with safety standards for pressure control and containment of hazardous fluids is mandatory.
  • Economic Constraints: The cost-benefit analysis of completion components, including packers, valves, and liners, must align with the projected economic life of the well.
b

What are the basic requirements of completion configuration must be able to solve the problems effectively?

8 marks

Answer

A robust completion configuration must be engineered to address operational challenges effectively. The basic requirements include:

  • Zonal Isolation: The configuration must effectively isolate the producing zones from non-productive or water-bearing formations to prevent fluid migration and ensure efficient reservoir management.
  • Sand Control: In unconsolidated formations, the design must incorporate mechanisms like gravel packs, screens, or chemical consolidation to prevent sand production, which can damage surface equipment and restrict flow.
  • Corrosion and Scale Resistance: Materials used in the completion string must be compatible with the reservoir fluids to prevent corrosion, erosion, and scale deposition, which could lead to premature failure.
  • Pressure Integrity: The completion must maintain a pressure-tight seal between the tubing and casing annulus, typically achieved through the use of production packers, to ensure safety and control.
  • Flexibility for Future Operations: The design should allow for future workovers, artificial lift installation (e.g., ESPs or gas lift), and diagnostic testing without requiring a full rig-based workover.
  • Flow Efficiency: The configuration must minimize flow restrictions and turbulence, ensuring that the pressure drop from the reservoir to the wellbore is kept to a minimum to maximize production rates.
  • Monitoring Capability: Integration of sensors or ports for downhole pressure and temperature monitoring is essential for real-time reservoir performance evaluation.
215 marks
a

Explain briefly the tubing less completions with neat sketches.

7 marks

Answer

Sign in to view the complete answer paper.

b

Discuss the general considerations of the flowing well equipment with neat diagram.

8 marks

Answer

Sign in to view the complete answer paper.

315 marks
a

Describe the wire line retrievable safety valves (WLR).

7 marks

Answer

Sign in to view the complete answer paper.

b

Explain in detail the gas influx behavior in open well and closed well migration.

8 marks

Answer

Sign in to view the complete answer paper.

415 marks
a

Explain a brief note about the SCSSV. And explain how to setting and testing the SCSSV.

7 marks

Answer

Sign in to view the complete answer paper.

b

Discuss briefly the sliding sleeve circulating valve with neat sketches.

8 marks

Answer

Sign in to view the complete answer paper.

515 marks
a

Explain in detail the various reasons for workover operations and its applications.

7 marks

Answer

Sign in to view the complete answer paper.

b

Explain in detail the workover equipment wireline and its uses.

8 marks

Answer

Sign in to view the complete answer paper.

615 marks
a

Design a tubing string for a 9,000-ft hydro pressured vertical well that is relatively straight, that will be used to flow 500 BOPD, and that will be completed inside 4 1/2-11.60-K55 casing. The well is to be completed with compression-set type packer and 9.0 ppg inhibited salt water in annulus. An over pull to free the packer of 15,000 lbf is anticipated. A maximum surface-treating pressure of 3,000 psi is expected.

7 marks

Answer

Sign in to view the complete answer paper.

b

Describe in detail the coiled tubing equipment with neat diagram.

8 marks

Answer

Sign in to view the complete answer paper.

7

Design tubing for relatively deep high-pressure gas well with CO2 and H2S. Assume the following conditions: casing designation = 5 1/2 - 23.00-L80; measured depth, Dm, = 14,000 ft; true vertical depth, DtV, = 13,000 ft; gas rate = 15 MMcf/D, 10 bbl of condensate per MMcf, 40 ppm hydrogen sulfide resulting in a partial pressure of 0.40 psi for the H2S and a 2% (20,000 ppm) carbon dioxide; pwh = 10,000 psi during stimulation; pbh = 9,000 psi; Tbh = 250 F; Tsf = 125 F; completion fluid weight = 14.0 ppg of inhibited solids free salt water; fluid gradient = 0.728 psi/ft; anticipated drag on tubing when pulling = 5,000 lbf; and packer shear pins setting = overpull = 25,000 lbf.

15 marks

Answer

Sign in to view the complete answer paper.

815 marks
a

Explain the liner completion with neat diagram.

7 marks

Answer

Sign in to view the complete answer paper.

b

What are the applications and objectives of well servicing?

8 marks

Answer

Sign in to view the complete answer paper.

About this paper

This page contains the solved question paper with answers of WELL COMPLETIONS, TESTING AND SERVICING from JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD for B.Tech PTM IV Year I Semester, March - 2021, R16.