JNTU

JNTU MCA 2018 SOFTWARE PROJECT MANAGEMENT Previous Question Paper (January - 2018 - R13)

MCA | 2018 | IV | R13 | January - 2018

Answer PaperPaper Code: 814AZMaximum Marks: 60Time: 3 Hours

Note: This question paper contains two parts A and B. Part A is compulsory which carries 20 marks. Answer all questions in Part A. Part B consists of 5 Units. Answer any one full question from each unit.

PART - A

Answer all questions. Each question carries 4 marks.

1a

What constitutes a good software cost estimate? Explain.

4 marks

Answer

A good software cost estimate is characterized by accuracy, reliability, and the ability to support effective project management decision-making. It serves as a realistic baseline for planning, budgeting, and tracking progress throughout the software development life cycle.

Key attributes of a good estimate include:

  • Accuracy and Precision: The estimate is based on historical data, clear requirements, and a defined scope, minimizing the variance between predicted and actual costs.
  • Transparency and Documentation: All assumptions, constraints, and methodologies used to derive the estimate are clearly documented, allowing stakeholders to understand the basis of the figures.
  • Inclusion of Contingency: It accounts for risks and uncertainties by incorporating a buffer or contingency reserve to handle unforeseen events or scope creep.
  • Iterative Refinement: The estimate is not static; it is updated periodically as more information becomes available, ensuring it remains relevant as the project evolves.
1b

Write Booch’s five characteristics of a successful object oriented project.

4 marks

Answer

Grady Booch identified five essential characteristics that distinguish successful object-oriented projects from those that fail. These characteristics focus on managing complexity and ensuring architectural integrity:

  • Architecture-centric: Successful projects prioritize the development of a robust, well-defined software architecture early in the lifecycle to serve as the foundation for the entire system.
  • Iterative and incremental: Development is organized into a series of short, time-boxed iterations, allowing for continuous refinement, early risk mitigation, and frequent feedback.
  • Use-case driven: Requirements are captured and validated through use cases, ensuring that the system's functionality is aligned with the needs of the end-users and stakeholders.
  • Risk-focused: The project team proactively identifies, prioritizes, and addresses technical and project-related risks during the earliest phases of development.
  • Managed evolution: The project maintains a controlled process for handling changes, ensuring that the system evolves in a disciplined manner without compromising the integrity of the architecture.
1c

Explain about test artifacts in brief.

4 marks

Answer

Sign in to view the complete answer paper.

1d

How should the evolutionary WBS be structured?

4 marks

Answer

Sign in to view the complete answer paper.

1e

What are the basic parameters of an earned value system?

4 marks

Answer

Sign in to view the complete answer paper.

PART - B

Answer any one full question from each unit. Each question carries 8 marks.

2

Explain the waterfall model approach and describe the five improvements to this model that would eliminate most of the development risks.

8 marks

Answer

Sign in to view the complete answer paper.

OR
3

How to improve software economics through team effectiveness and automation? Discuss in detail.

8 marks

Answer

Sign in to view the complete answer paper.

4

What are the modern process approaches for solving conventional problems? Discuss.

8 marks

Answer

Sign in to view the complete answer paper.

OR
5

Explain the key practices that improve the overall software quality.

8 marks

Answer

Sign in to view the complete answer paper.

6

What are the essential activities in Inception and construction phases? Discuss.

8 marks

Answer

Sign in to view the complete answer paper.

OR
7

Discuss in detail about management and engineering artifacts.

8 marks

Answer

Sign in to view the complete answer paper.

8

Discuss the activities that take place in the work flows in each of the software development phases.

8 marks

Answer

Sign in to view the complete answer paper.

OR
9

Explain about the four component teams in a default line-of-business organization and their responsibilities.

8 marks

Answer

Sign in to view the complete answer paper.

10

Why are the metrics divided into management and quality indicators? Name the core metrics under each category.

8 marks

Answer

Sign in to view the complete answer paper.

OR
118 marks
a

What are the priorities used for tailoring the process framework?

4 marks

Answer

Sign in to view the complete answer paper.

b

Discuss about process discriminants.

4 marks

Answer

Sign in to view the complete answer paper.

About this paper

This page contains the question paper of SOFTWARE PROJECT MANAGEMENT from JNTU for MCA 2018 IV, January - 2018, R13.

For the solved question paper with answers, switch to the Answer Paper tab.

Other papers in SOFTWARE PROJECT MANAGEMENT

Loading Question Papers

Fetching data from database...