B.Tech III Year II Semester (R16)
At the end of the course, the student will be able to assess properties of
sludge and plain suitable disposal methods
Introduction– Sewage Systems sewage and storm water estimation – time of concentration – storm water overflows combined flow – characteristics of sewage – examination of sewage – B.O.D. – C.O.D. equations.
Design of sewers – shapes and materials – sewer appurtenances manholes – inverted siphon – catch basins – flushing tanks – ejectors, pumps and pump houses – house drainage – components requirements – sanitary fittings-traps – one pipe and two pipe systems of plumbing. Sewage maintenance, sewage construction sewage objectives of Treatment units
Layout and general outline of various units in a waste water treatment plant – primary treatment design of screens – grit chambers – skimming tanks – sedimentation tanks
Principles and design of biological treatment – trickling filters – standard and high rate- Filters – ASP – ASP modification – Aeration. Construction and design of oxidation ponds – Oxidation ditches – Sludge Treatment. Other biological treatment with oxidation ponds, oxidation ditches lagoons
Sludge digestion tanks –design of Digestion tank –Factors affecting sludge digestion - Sludge disposal by drying – septic tanks - working principles and design – soak pits. Ultimate disposal of waste water – self purification of rivers – Sewage farming.
Loading Question Papers
Fetching data from database...