JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD

PE701PC: WELL COMPLETIONS, TESTING AND SERVICING

B.Tech IV Year I Semester (R16)

Prerequisites

Drilling Technology

Course Objectives:

  • Knowledge of subsurface equipment below well head.
  • Planning and designing of well completion after testing of the hydrocarbon zones available.
  • Knowledge of subsurface circulating equipment and packers.
  • Testing of multi zones in a well with DST/RFT with logging tools as well as surface testing equipment.

Course Outcomes

The student can

  • Have the knowledge of various equipment used in & on wells.
  • Have the knowledge of DST/RFT to know the initial potential of the wells.
  • Plan and design the well completion depending of the casing policy and the number of objectives available in the well.
  • Also plan for suitable safety valves in sub surface as well as on well head for the safe operation of the high pressure and high temperature wells.
  • Also be a good work over engineer to repair and maintenance of a sick well.
  • Be a good CTU (Coil Tubing unit) operator whenever rigs less operation are required to be taken up.

UNIT - I

Well completion: Types of wells- Completion functions- Types of completion.

UNIT - II

Mechanical aspects of well testing- Cased hole logging equipment and application and perforation methods and perforation equipment.

UNIT - III

Packers: Function- Application- Proper selection- Packer setting – Packer loads - water / gas shut off, horizon separation etc.

UNIT - IV

Completion equipment (SSD, SSSV, mandrels, locks etc.)- Data acquisition in wells- Fibre optics- Permanent gauges- Memory gauges- Intelligent completion equipment. Tubing string design (dimension, materials and connections etc.) based on pressure, temperature, operating conditions- Media- Safety requirements.

R16 B.TECH PETROLEUM ENGG.

UNIT - V

Drill Stem Testing: General Procedure and considerations- Test tool components and arrangement-Analysis of Test data. HPHT and horizontal well completions- Workover equipment wireline- Scrubbing unit- Coil tubing completion and work over design and execution.

TEXT BOOKS:

  • 1. Well Completion and Servicing, D. Perrin, Micheal Caron, Georges Gaillot, Editions Technip, 1999.
  • 2. Primer of Well Service, Workover and Completion, Petroleum Extension Service (PETEX), University of Texas at Austin, 1997.
  • 3. Well Testing, John Lee, Society of Petroleum Engineers, 1982.

REFERENCE BOOKS:

  • 1. Well Completion Design, Jonathan Bellarby, Elsevier, 2009.
  • 2. Petroleum Engineering: Principles and Practice, J.S Archer & C.G. Wall, Graham & Trotman, Inc., 1986.
  • 3. Advanced Well Completion Engineering, Wan Renpu, Gulf Professional Publishing, 2011. R16 B.TECH PETROLEUM ENGG.

Loading Question Papers

Fetching data from database...