JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD

EE605PC: POWER SYSTEM LAB

B.Tech III Year II Semester (R18)

Prerequisite

Power System-I, Power System-II, Power System Protection, Power System Operation

and Control, Electrical Machines

Course Objectives:

  • perform testing of CT, PT's and Insulator strings
  • To find sequence impedances of 3-Φ synchronous machine and Transformer
  • To perform fault analysis on Transmission line models and Generators.

Course Outcomes

After completion of this lab, the student will be able to

  • Perform various load flow techniques
  • Understand Different protection methods
  • Analyze the experimental data and draw the conclusions. The following experiments are required to be conducted as compulsory experiments: Part - A
  • 1. Characteristics of IDMT Over-Current Relay.
  • 2. Differential protection of 1-Φ transformer.
  • 3. Characteristics of Micro Processor based Over Voltage/Under Voltage relay.
  • 4. A,B,C,D constants of a Long Transmission line
  • 5. Finding the sequence impedances of 3-Φ synchronous machine.
  • 6. Finding the sequence impedances of 3-Φ Transformer. In addition to the above six experiments, at least any four of the experiments from the following list are required to be conducted. Part - B
  • 1. Formation of YBUS.
  • 2. Load Flow Analysis using Gauss Seidal (GS) Method.
  • 3. Load Flow Analysis using Fast Decoupled (FD) Method.
  • 4. Formation of ZBUS.
  • 5. Simulation of Compensated Line

TEXT BOOKS:

  • 1. C.L. Wadhwa: Electrical Power Systems –Third Edition, New Age International Pub. Co., 2001.
  • 2. Hadi Sadat: Power System Analysis –Tata Mc Graw Hill Pub. Co. 2002.

REFERENCES:

  • 1. D. P. Kothari: Modern Power System Analysis-Tata Mc Graw Hill Pub. Co. 2003. R18 B.TECH EEE III YEAR