B.Tech IV Year II Semester (R18)
NIL
The students will have knowledge on planning of opencast mining, underground
mining and equipment utilization. They will also know about project implementation and monitoring methods.
Introduction: Technical factors in mine planning, methodology of mine planning, short range & long range, Optimization Techniques in Mine Planning; mine plan preparation; Choice between surface and underground mining.
Opencast Mining: Development of Ultimate Pit Configuration (open pit limits) and its determination – hand method, floating cone technique, Lerchs-Grossmann algorithm and computer assisted hand method; Selection of initial mine cuts and geometrical considerations; location of surface structures, division of mining area into blocks, mine design, Impact of various parameters like depth, dip, stripping ratio, geology and strength of mineral and overburden on mine planning; Selection of Mining Systems; Determination of optimum mine size and sequencing by nested pits; Lanes algorithm for estimation of optimum mill grade and production planning; calendar plan, production scheduling, economic productivity indices. Quality Control-Ore Blending; Planning for mine closure.
Underground Mining: Design of mine entries – shafts, inclines, design of stopes – size, level interval, etc, design of coal mining district, mine boundaries; design of shaft pillars and protective pillars, planning of production capacity , optimization of mine size – mine production capacity, layout of development drives / raises / winzes etc, length of faces, etc, planning of support systems, ventilation, layout of drainage system; Production planning & Production scheduling, selection of depillaring / stoping method, manpower management economic/ productivity indices, Productivity and quality control; Techno- economic analysis, Planning for mine closure.
Equipment Planning: Latest technological developments in increase in both types and capacities of equipment used in mining operations. Planning and selection of equipment, their capacities and population for different mining conditions. Maintenance planning and scheduling including spare management; Equipment information – performance monitoring and expert systems.
Project Implementation and Monitoring: Pre-project activities – feasibility report, environmental clearance, detailed project report, sources of funds, import of technology, selection of contracts and contract administration, time management, cost control material management system, project quality assurance, social responsibility, government orders and guidelines. Environmental impact assessment and preparation of environmental management plan.
Loading Question Papers
Fetching data from database...