JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD

STATISTICAL QUALITY CONTROL SYSTEM LAB

M.Tech I Year I Semester (R22)

List of Experiments:

  • 1. Construction of X and R charts
  • 2. Construction of P Chart
  • 3. Construction of C Chart
  • 4. Construction of NC Chart
  • 5. Construction of Single Sampling Plan, given N = 1000, n = 10 and c = 2.
  • 6. Construction of Double Sampling plan, given N = 1000, n1 = 100, c1 = 0, n2 = 50, c2 = 2.
  • 7. Construction of Single sampling plan and Double Sampling plan for specified design and find out customer risk and producer risk.
  • 8. Drawing of Quality Control
  • 9. Drawing of Cause and Effect (Fish Bone) diagram.
  • 10. Drawing Pareto diagram. M. TECH. I Year II Sem. (IEM)

Loading Question Papers

Fetching data from database...