JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD
STATISTICAL QUALITY CONTROL SYSTEM LAB
M.Tech I Year I Semester (R22)
List of Experiments:
1. Construction of X and R charts
2. Construction of P Chart
3. Construction of C Chart
4. Construction of NC Chart
5. Construction of Single Sampling Plan, given N = 1000, n = 10 and c = 2.
6. Construction of Double Sampling plan, given N = 1000, n1 = 100, c1 = 0, n2 = 50, c2 = 2.
7. Construction of Single sampling plan and Double Sampling plan for specified design and find out customer risk and producer risk.
8. Drawing of Quality Control
9. Drawing of Cause and Effect (Fish Bone) diagram.
10. Drawing Pareto diagram. M. TECH. I Year II Sem. (IEM)
Loading Question Papers
Fetching data from database...