Answer PaperPaper Code: 247ABMaximum Marks: 75Time: 3 Hours

Answer any five questions. All questions carry equal marks.

Main

1

Explain the pilot plant scale-up techniques for solid dosage forms.

15 marks

Answer

Pilot plant scale-up for solid dosage forms is the process of transitioning a laboratory-scale formulation into a viable commercial-scale production process. The primary objective is to ensure that the product quality, safety, and efficacy remain consistent while scaling up equipment size and batch volume.

Key considerations and techniques include:

  • Equipment Selection: Equipment used in the pilot plant must be geometrically similar to the production-scale equipment. This ensures that the physical forces (e.g., shear, compression, mixing intensity) applied to the product are proportional across scales.
  • Process Parameters: Critical Process Parameters (CPPs) such as impeller speed, granulation time, drying temperature, and compression force must be identified and optimized. Scale-up often involves maintaining constant parameters like tip speed or power-per-unit volume rather than just matching RPM.
  • Granulation Techniques: During wet granulation, the liquid-to-solid ratio and the method of liquid addition are critical. The pilot plant must evaluate the impact of increased batch size on granule size distribution and moisture content to ensure consistent flow and compressibility.
  • Drying: Scaling up drying processes (e.g., fluid bed drying) requires monitoring airflow, inlet temperature, and bed depth. The drying rate is often limited by mass transfer, which changes with the volume of the material in the dryer.
  • Tableting: Compression scale-up focuses on dwell time and feeder speed. The pilot plant must assess the tablet's physical properties, such as hardness, friability, and disintegration time, at higher production speeds to ensure that the formulation can withstand the mechanical stress of high-speed rotary presses.
  • Scale-up Reporting: A comprehensive scale-up report must document all deviations, adjustments to processing parameters, and analytical testing results (dissolution profiles, content uniformity) to provide a regulatory basis for commercial manufacturing.

The success of the scale-up is validated through Process Validation, where at least three consecutive batches are produced at commercial scale to demonstrate that the process consistently yields a product meeting all predetermined specifications.

215 marks
a

Discuss about reporting responsibilities and space requirements in pilot plant scale up.

8 marks

Answer

Reporting responsibilities in pilot plant scale-up ensure that data generated during the transition from laboratory to commercial production is documented, verified, and communicated to relevant departments like Quality Assurance, Regulatory Affairs, and Production. Key responsibilities include maintaining detailed batch records, documenting deviations, recording stability data, and preparing a final scale-up report that validates the process parameters and equipment performance.

Space requirements are critical for efficient workflow and safety. The pilot plant must provide adequate space for: 1) Equipment installation, allowing for proper cleaning, maintenance, and operation; 2) Material storage, including raw materials, intermediates, and finished products under controlled environmental conditions; 3) Personnel movement to prevent cross-contamination; 4) In-process quality control testing areas; and 5) Utilities such as HVAC, water purification systems, and waste disposal zones. The layout must follow cGMP guidelines to ensure segregated areas for different stages of manufacturing.

b

Explain platform technology and its importance.

7 marks

Answer

Sign in to view the complete answer paper.

315 marks
a

Describe the WHO guidance on technology transfer.

7 marks

Answer

Sign in to view the complete answer paper.

b

Explain the process of analytical method transfer in detail.

8 marks

Answer

Sign in to view the complete answer paper.

4

Discuss about approved regulatory bodies and agencies in India.

15 marks

Answer

Sign in to view the complete answer paper.

515 marks
a

What are roles of regulatory affairs department?

5 marks

Answer

Sign in to view the complete answer paper.

b

Write about the general considerations for IND application.

6 marks

Answer

Sign in to view the complete answer paper.

c

What are the different phases of clinical trails?

4 marks

Answer

Sign in to view the complete answer paper.

615 marks
a

Write about management of clinical studies.

8 marks

Answer

Sign in to view the complete answer paper.

b

Discuss on data presentation for FDA submissions.

7 marks

Answer

Sign in to view the complete answer paper.

715 marks
a

Explain the concept of Total Quality management in pharmaceutical industry.

10 marks

Answer

Sign in to view the complete answer paper.

b

Write about out of specification (OOS).

5 marks

Answer

Sign in to view the complete answer paper.

815 marks
a

Explain about the role and responsibilities of CDSCO.

10 marks

Answer

Sign in to view the complete answer paper.

b

Write about the certificate of pharmaceutical product (COPP).

5 marks

Answer

Sign in to view the complete answer paper.

About this paper

This page contains the question paper of INDUSTRIAL PHARMACY - II from JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD for B. Pharmacy IV Year I Semester, February-2022, R17.

For the solved question paper with answers, switch to the Answer Paper tab.

Other papers in INDUSTRIAL PHARMACY - II

Loading Question Papers

Fetching data from database...