Part A
List the factors that affect the runoff from catchment area.
Answer
The factors affecting runoff include precipitation characteristics (intensity, duration, and distribution), catchment characteristics (size, shape, slope, and land use), soil type, geological conditions, and initial moisture conditions.
Describe various types of precipitation.
Answer
Precipitation is classified based on the mechanism of lifting the air mass:
- Cyclonic precipitation: Caused by the lifting of air due to pressure differences in a cyclone or anticyclone.
- Convective precipitation: Caused by the heating of air near the ground, causing it to rise, cool, and condense.
- Orographic precipitation: Caused by air masses being forced to rise over mountain barriers.
What is effective rainfall?
Answer
Sign in to view the complete answer paper.
Write down the assumptions of unit hydrograph.
Answer
Sign in to view the complete answer paper.
Define aquiclude.
Answer
Sign in to view the complete answer paper.
Draw the divisions of sub-surface water.
Answer
Sign in to view the complete answer paper.
List the importance of irrigation.
Answer
Sign in to view the complete answer paper.
What are the ill effects of irrigation?
Answer
Sign in to view the complete answer paper.
How do you classify the canal, based on the functions of the canal?
Answer
Sign in to view the complete answer paper.
What are the disadvantages of canal lining?
Answer
Sign in to view the complete answer paper.
Part B
Explain tipping bucket type rain gauge with a neat sketch.
Answer
Sign in to view the complete answer paper.
Describe the factors affecting infiltration.
Answer
Sign in to view the complete answer paper.
Explain any one method of estimation of evaporation in detail.
Answer
Sign in to view the complete answer paper.
Describe any two methods of computing average rainfall over the basin.
Answer
Sign in to view the complete answer paper.
What is unit hydrograph? How do you construct it?
Answer
Sign in to view the complete answer paper.
Describe the two methods of separating base flow from the total runoff.
Answer
Sign in to view the complete answer paper.
The ordinates of a 4h unit hydrograph of a basin area 300km2 measured at 1h intervals are 6, 36, 66, 91, 106, 93, 79, 68, 58, 49, 41, 34, 27, 23, 17, 13, 9, 6, 3 and 1.5 m3/s respectively. Obtain the ordinates of a 3h unit hydrograph for the basin using the S-curve technique.
Answer
Sign in to view the complete answer paper.
Explain the types of aquifer.
Answer
Sign in to view the complete answer paper.
How do you determine the yield of the open well from recuperation test?
Answer
Sign in to view the complete answer paper.
Explain in detail the types of tube wells along with their construction details.
Answer
Sign in to view the complete answer paper.
Explain in detail the factors affecting duty.
Answer
Sign in to view the complete answer paper.
After how many days will you supply water to soil in order to ensure efficient irrigation of the given crop, if:
a) Field capacity of soil = 27%
b) Permanent wilting point = 14%
c) Dry density of soil = 15kN/m3
d) Effective depth of root zone = 75 cm
e) Daily consumptive use of water for the given crop = 11mm.
Answer
Sign in to view the complete answer paper.
Design a regime channel for a discharge of 35 m3/s with silt factor of 0.9 by Lacey’s theory, taking side slopes as 1H:2V.
Answer
Sign in to view the complete answer paper.
Explain the balancing depth of cutting.
Answer
Sign in to view the complete answer paper.
Explain the flood frequency analysis method.
Answer