JNTU B.Tech III ENVIRONMENTAL ENGINEERING Previous Question Paper (May - 2019 - R16)

B.Tech | III | III-II | R16 | May - 2019

Answer PaperPaper Code: 136BTMaximum Marks: 75Time: 3 hours

Part A is compulsory. Part B consists of 5 Units. Answer any one full question from each unit.

Part A

125 marks
a

What are the factors should be keep in mind while fixing the design period?

2 marks

Answer

The design period is determined by considering the useful life of the components, the ease or difficulty of future expansion, the availability of funds, the anticipated rate of population growth, and the interest rates on loans.

b

Write down few water supply schemes in India.

3 marks

Answer

Prominent water supply schemes in India include the Jal Jeevan Mission, the Accelerated Rural Water Supply Programme (ARWSP), the National Rural Drinking Water Programme (NRDWP), and various state-specific projects like the Mission Bhagiratha in Telangana.

c

What is meant by coagulation and flocculation?

2 marks

Answer

Sign in to view the complete answer paper.

d

Write down the types of disinfections in treatment of water.

3 marks

Answer

Sign in to view the complete answer paper.

e

State what are factors mainly affect the quantity of storm sewage.

2 marks

Answer

Sign in to view the complete answer paper.

f

Explain the time of concentration and its significance in design of storm sewers.

3 marks

Answer

Sign in to view the complete answer paper.

g

Explain the screening operation in water treatment system.

2 marks

Answer

Sign in to view the complete answer paper.

h

Explain the grit chamber in water treatment system.

3 marks

Answer

Sign in to view the complete answer paper.

i

Explain the soak pit in brief along with neat sketch.

2 marks

Answer

Sign in to view the complete answer paper.

j

What is meant by grit chambers?

3 marks

Answer

Sign in to view the complete answer paper.

Part B

210 marks
a

Differentiate confined and unconfined aquifers.

5 marks

Answer

Sign in to view the complete answer paper.

b

Explain the basic functioning of the hydrologic cycle.

5 marks

Answer

Sign in to view the complete answer paper.

OR
310 marks
a

Enlist the different methods of population forecast and state for which type of growing city Geometrical increase method is useful. By using Incremental increase method of population forecasting find out the probable population of a town in 2040AD for the given data.

5 marks

Answer

Sign in to view the complete answer paper.

b

Briefly discuss water quality testing.

5 marks

Answer

Sign in to view the complete answer paper.

410 marks
a

Discuss the theory of chlorination (write equations also).

5 marks

Answer

Sign in to view the complete answer paper.

b

Briefly explain-primary, secondary and territory treatment of water.

5 marks

Answer

Sign in to view the complete answer paper.

OR
510 marks
a

Write various disinfection treatment methods.

5 marks

Answer

Sign in to view the complete answer paper.

b

Briefly discuss the theory of filtration.

5 marks

Answer

Sign in to view the complete answer paper.

610 marks
a

Mention the various aspects you would keep in view when designing a sewer.

5 marks

Answer

Sign in to view the complete answer paper.

b

A 30 cm dia sewer an invert slope of 1 in 400 is flowing 1/3rd of the full depth. Calculate the velocity and the rate of flow in the sewer. Is it self-cleaning velocity? Use n=0.015.

5 marks

Answer

Sign in to view the complete answer paper.

OR
710 marks
a

Briefly discuss the advantages and disadvantages of combined system of sewage.

5 marks

Answer

Sign in to view the complete answer paper.

b

What are the methods of collection of sanitation?

5 marks

Answer

Sign in to view the complete answer paper.

810 marks
a

Discuss a primary sedimentation for treating 1.5 MLD of waste water (with suitable assumptions).

5 marks

Answer

Sign in to view the complete answer paper.

b

State and explain ‘dry weather flow’.

5 marks

Answer

Sign in to view the complete answer paper.

OR
910 marks
a

What are the features of fill and draw settling tanks.

5 marks

Answer

Sign in to view the complete answer paper.

b

Discuss the characteristics of sludge.

5 marks

Answer

Sign in to view the complete answer paper.

1010 marks
a

What is ASP? Give the advantages and disadvantages of it.

5 marks

Answer

Sign in to view the complete answer paper.

b

What is activated sludge process?

5 marks

Answer

Sign in to view the complete answer paper.

OR
1110 marks
a

Discuss the relationship between algae and bacteria during the treatment of sewage in an oxidation pond.

5 marks

Answer

Sign in to view the complete answer paper.

b

Discuss the most suitable low cost method of sewage treatment in tropical countries.

5 marks

Answer

Sign in to view the complete answer paper.

About this paper

This page contains the question paper of ENVIRONMENTAL ENGINEERING from JNTU for B.Tech CE III III-II, May - 2019, R16.

For the solved question paper with answers, switch to the Answer Paper tab.