JNTU

JNTU B.Tech III ENVIRONMENTAL ENGINEERING Previous Question Paper (November/December - 2020 - R16)

B.Tech | III | II | R16 | November/December - 2020

Answer PaperPaper Code: 136BTMaximum Marks: 75Time: 2 Hours

Answer any five questions

All questions carry equal marks

Main

1

The following data have been noted from the census department.

YearPopulation
19609,000
197016,000
198019,000
199032,500

Calculate the probable population in the year of 2020 and 2040.

15 marks

Answer

To estimate the population for the years 2020 and 2040, the Incremental Increase Method is the most appropriate approach as it accounts for the changing rate of growth.

YearPopulation (P)Increase (I)Incremental Increase (r)
19609,000--
197016,0007,000-
198019,0003,000-4,000
199032,50013,50010,500
Total-23,5006,500

Average increase (x̄) = 23,500 / 3 = 7,833.33. Average incremental increase (ȳ) = 6,500 / 2 = 3,250.

The formula for future population is Pn = Po + n(x̄) + [n(n+1)/2]ȳ, where Po is the last known population (32,500 in 1990) and n is the number of decades.

For 2020 (n = 3 decades):
P2020 = 32,500 + 3(7,833.33) + [3(4)/2](3,250)
P2020 = 32,500 + 23,500 + 19,500 = 75,500

For 2040 (n = 5 decades):
P2040 = 32,500 + 5(7,833.33) + [5(6)/2](3,250)
P2040 = 32,500 + 39,166.65 + 48,750 = 120,416.65

The probable population is 75,500 in 2020 and approximately 120,417 in 2040.

2

What is an intake structure? With a neat sketch, describe reservoir intake.

15 marks

Answer

An intake structure is a hydraulic facility designed to withdraw water from a surface source, such as a river, lake, or reservoir, and convey it to the water treatment plant. Its primary functions are to ensure a continuous supply of water, protect the conveyance system from debris and ice, and allow for the selection of water from different depths to optimize quality.

A reservoir intake is typically constructed in a dam or near the embankment of a reservoir. Because water levels in reservoirs fluctuate significantly due to seasonal demand and rainfall, these intakes are designed to draw water at varying elevations.

Key components and operation of a reservoir intake include:

  • Intake Tower: A vertical masonry or concrete structure located in the reservoir, equipped with multiple intake ports (gates) at different levels to allow withdrawal of water from the best available quality zone.
  • Conduit: A pipe or tunnel that transports the water from the intake tower through or under the dam to the treatment plant.
  • Trash Rack: A screen placed at the entrance of the intake ports to prevent floating debris, fish, or large objects from entering the system.
  • Operating Mechanism: Valves or sluice gates located within the tower that are operated from a bridge or the top of the tower to control the flow and select the intake level.

In a typical sketch, the reservoir intake is represented as a tower structure situated within the reservoir basin. The diagram would show the water surface level, the intake ports at various heights along the tower face, the trash racks covering these ports, the internal piping system, and the conduit leading through the dam body to the downstream side. The tower is usually connected to the dam crest by a footbridge to provide access for maintenance and operation of the control valves.

3

Distinguish between slow and rapid gravity filters.

15 marks

Answer

Sign in to view the complete answer paper.

4

Explain the theory of chlorination.

15 marks

Answer

Sign in to view the complete answer paper.

5

A main sewer is to be designed to receive a flow from 1 square kilometre area of a community where the population density is 300 persons per hectare. The average sewage flow is 150 lpcd. What is the design flow for the main sewer?

15 marks

Answer

Sign in to view the complete answer paper.

6

What are the materials used for pipe sewers? Write their merits and demerits.

15 marks

Answer

Sign in to view the complete answer paper.

7

Explain the process steps involved in a trickling filter.

15 marks

Answer

Sign in to view the complete answer paper.

8

Explain step by step design of digestion tank.

15 marks

Answer

Sign in to view the complete answer paper.

About this paper

This page contains the question paper of ENVIRONMENTAL ENGINEERING from JNTU for B.Tech CE III II, November/December - 2020, R16.

For the solved question paper with answers, switch to the Answer Paper tab.