Note: i) Question paper consists of Part A, Part B. ii) Part A is compulsory, which carries 25 marks. In Part A, Answer all questions. iii) In Part B, Answer any one question from each unit. Each question carries 10 marks and may have a, b as sub questions.

Part A

125 marks
a

What are the key components of Taylor’s Scientific Management Theory?

2 marks

Answer

The key components of Taylor’s Scientific Management are science, not rule of thumb; harmony, not discord; cooperation, not individualism; and the development of each person to their greatest efficiency and prosperity.

b

List any six principles of management.

3 marks

Answer

  1. Division of work
  2. Authority and responsibility
  3. Discipline
  4. Unity of command
  5. Unity of direction
  6. Subordination of individual interest to general interest
c

Explain the differences between line organization, line and staff organization.

2 marks

Answer

Sign in to view the complete answer paper.

d

Define departmentation and decentralization.

3 marks

Answer

Sign in to view the complete answer paper.

e

Define mass production.

2 marks

Answer

Sign in to view the complete answer paper.

f

Describe the product design process and its key stages.

3 marks

Answer

Sign in to view the complete answer paper.

g

Define work measurement.

2 marks

Answer

Sign in to view the complete answer paper.

h

What are the key steps involved in conducting a work study?

3 marks

Answer

Sign in to view the complete answer paper.

i

Define job evaluation.

2 marks

Answer

Sign in to view the complete answer paper.

j

What are the different methods of job evaluation?

3 marks

Answer

Sign in to view the complete answer paper.

Part B

2

Explain the difference between McGregor’s Theory X and Theory Y in terms of assumptions about employee behavior.

10 marks

Answer

Sign in to view the complete answer paper.

OR
3

Evaluate the applicability of Herzberg’s Two-Factor Theory of Motivation in today’s dynamic work environments, considering its strengths and limitations.

10 marks

Answer

Sign in to view the complete answer paper.

4

How does a matrix organization differ from a committee organization in terms of structure and decision-making processes?

10 marks

Answer

Sign in to view the complete answer paper.

OR
5

How would you apply the concept of a virtual organization to enhance collaboration and flexibility within a geographically dispersed team?

10 marks

Answer

Sign in to view the complete answer paper.

6

Explain the differences between job production, batch production, and mass production systems.

10 marks

Answer

Sign in to view the complete answer paper.

OR
7

Assess the challenges and benefits of implementing a lean production system in a traditional mass production facility, considering factors such as cultural change and resource allocation.

10 marks

Answer

Sign in to view the complete answer paper.

810 marks
a

Define work study and its primary objectives.

5 marks

Answer

Sign in to view the complete answer paper.

b

How does work measurement differ from method study?

5 marks

Answer

Sign in to view the complete answer paper.

OR
910 marks
a

Evaluate the effectiveness of work sampling as a method for estimating workloads and identifying process bottlenecks within a healthcare setting.

5 marks

Answer

Sign in to view the complete answer paper.

b

Differentiate between variables and attributes control charts.

5 marks

Answer

Sign in to view the complete answer paper.

10

How does the classification method in job evaluation categorize jobs based on predetermined factors or criteria?

10 marks

Answer

Sign in to view the complete answer paper.

OR
1110 marks
a

Define PERT and CPM and explain their significance in project management.

5 marks

Answer

Sign in to view the complete answer paper.

b

Consider a software development project with the following activities:

ActivityOptimistic Time (days)Most Likely Time (days)Pessimistic Time (days)
A468
B579
C357
D6810
E246
F468

Assuming activities are independent, calculate: i) Expected time for each activity ii) Variance for each activity iii) Expected project duration iv) Probability that the project will be completed within 24 days.

5 marks

Answer

Sign in to view the complete answer paper.

About this paper

This page contains the solved question paper with answers of INDUSTRIAL MANAGEMENT from JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD for B.Tech CE III III-II, August/September - 2024, R16.

For the question paper without answers, switch to the Question Paper tab.