JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD B.Tech IV Year ESTIMATING AND COSTING Previous Question Paper (May/June - 2019 - R15)
Note: This question paper contains two parts A and B. Part A is compulsory which carries 25 marks. Answer all questions in Part A. Part B consists of 5 Units. Answer any one full question from each unit. Each question carries 10 marks and may have a, b, c as sub questions.
PART A
What is plinth area estimate.
Answer
A plinth area estimate is an approximate estimate prepared by multiplying the plinth area of a building by the plinth area rate of a similar building in the same locality. The plinth area is measured at the floor level of the building, excluding the plinth offsets.
List the various purpose of estimating.
Answer
- To determine the probable cost of a project before its execution.
- To assess the financial feasibility and budget requirements.
- To invite tenders and compare bids from contractors.
- To facilitate the procurement of materials and planning of labor.
What is lift in earth work calculations?
Answer
Sign in to view the complete answer paper.
What is the volume of fully excavated trapezoidal cross section canal?
Answer
Sign in to view the complete answer paper.
What do you mean by schedule of rates?
Answer
Sign in to view the complete answer paper.
What are the factors on which the rate of particular item of work depends?
Answer
Sign in to view the complete answer paper.
What is the unit weight of 32mm diameter steel bar?
Answer
Sign in to view the complete answer paper.
Explain unit price contract.
Answer
Sign in to view the complete answer paper.
What do you mean by Depreciation?
Answer
Sign in to view the complete answer paper.
Describe capitalized value.
Answer
Sign in to view the complete answer paper.
PART B
Mention the different types of estimate and explain them in detail.
Answer
Sign in to view the complete answer paper.
Discuss in detail, the approximate methods of estimation of buildings.
Answer
Sign in to view the complete answer paper.
Explain in detail about the three cases of canal sections with neat sketches.
Answer
Sign in to view the complete answer paper.
Estimate the quantity of earthwork for an embankment 120 m long, 8m wide at crest, side slope is 2:1, the central height from 0 to 120 m at every 30 m interval are 0.8, 1.1, 1.5, 1.9, 1.3.
Answer
Sign in to view the complete answer paper.
Prepare analysis of rates for the following item of work. 1st class brick work in foundation of 1:3 cement mortars – unit 1 cu.m.
Answer
Sign in to view the complete answer paper.
What are the requirements of rate analysis? Discuss the factors affecting the rate analysis?
Answer
Sign in to view the complete answer paper.
Estimate the quantity of steel for any type of RCC beam with an illustrative example and explain the importance of bar bending schedule.
Answer
Sign in to view the complete answer paper.
Explain types of engineering contracts with advantages and disadvantages.
Answer
Sign in to view the complete answer paper.
Explain in detail about the four methods of calculating depreciation.
Answer
Sign in to view the complete answer paper.
Explain in detail specifications of earthwork in excavation.
Answer
Sign in to view the complete answer paper.