JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD

JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD B.Tech IV Year ESTIMATING AND COSTING Previous Question Paper (May/June - 2019 - R15)

B.Tech | IV Year | I Semester | R15 | May/June - 2019

Answer PaperPaper Code: 127DEMaximum Marks: 75Time: 3 Hours

Note: This question paper contains two parts A and B. Part A is compulsory which carries 25 marks. Answer all questions in Part A. Part B consists of 5 Units. Answer any one full question from each unit. Each question carries 10 marks and may have a, b, c as sub questions.

PART A

125 marks
a

What is plinth area estimate.

2 marks

Answer

A plinth area estimate is an approximate estimate prepared by multiplying the plinth area of a building by the plinth area rate of a similar building in the same locality. The plinth area is measured at the floor level of the building, excluding the plinth offsets.

b

List the various purpose of estimating.

3 marks

Answer

  • To determine the probable cost of a project before its execution.
  • To assess the financial feasibility and budget requirements.
  • To invite tenders and compare bids from contractors.
  • To facilitate the procurement of materials and planning of labor.
c

What is lift in earth work calculations?

2 marks

Answer

Sign in to view the complete answer paper.

d

What is the volume of fully excavated trapezoidal cross section canal?

3 marks

Answer

Sign in to view the complete answer paper.

e

What do you mean by schedule of rates?

2 marks

Answer

Sign in to view the complete answer paper.

f

What are the factors on which the rate of particular item of work depends?

3 marks

Answer

Sign in to view the complete answer paper.

g

What is the unit weight of 32mm diameter steel bar?

2 marks

Answer

Sign in to view the complete answer paper.

h

Explain unit price contract.

3 marks

Answer

Sign in to view the complete answer paper.

i

What do you mean by Depreciation?

2 marks

Answer

Sign in to view the complete answer paper.

j

Describe capitalized value.

3 marks

Answer

Sign in to view the complete answer paper.

PART B

2

Mention the different types of estimate and explain them in detail.

10 marks

Answer

Sign in to view the complete answer paper.

OR
3

Discuss in detail, the approximate methods of estimation of buildings.

10 marks

Answer

Sign in to view the complete answer paper.

4

Explain in detail about the three cases of canal sections with neat sketches.

10 marks

Answer

Sign in to view the complete answer paper.

OR
5

Estimate the quantity of earthwork for an embankment 120 m long, 8m wide at crest, side slope is 2:1, the central height from 0 to 120 m at every 30 m interval are 0.8, 1.1, 1.5, 1.9, 1.3.

10 marks

Answer

Sign in to view the complete answer paper.

6

Prepare analysis of rates for the following item of work. 1st class brick work in foundation of 1:3 cement mortars – unit 1 cu.m.

10 marks

Answer

Sign in to view the complete answer paper.

OR
7

What are the requirements of rate analysis? Discuss the factors affecting the rate analysis?

10 marks

Answer

Sign in to view the complete answer paper.

8

Estimate the quantity of steel for any type of RCC beam with an illustrative example and explain the importance of bar bending schedule.

10 marks

Answer

Sign in to view the complete answer paper.

OR
9

Explain types of engineering contracts with advantages and disadvantages.

10 marks

Answer

Sign in to view the complete answer paper.

10

Explain in detail about the four methods of calculating depreciation.

10 marks

Answer

Sign in to view the complete answer paper.

OR
11

Explain in detail specifications of earthwork in excavation.

10 marks

Answer

Sign in to view the complete answer paper.

About this paper

This page contains the solved question paper with answers of ESTIMATING AND COSTING from JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD for B.Tech CEE IV Year I Semester, May/June - 2019, R15.

For the question paper without answers, switch to the Question Paper tab.

Other papers in ESTIMATING AND COSTING

Loading Question Papers

Fetching data from database...