JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD

JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD B. Tech III Year TRANSPORTATION ENGINEERING Previous Question Paper (March - 2021 - R18)

B. Tech | III Year | I Semester | R18 | March - 2021

Answer PaperPaper Code: 155DJMaximum Marks: 75Time: 3 Hours

Answer any five questions

All questions carry equal marks

Main

1

Write in detail about the PPP schemes of Highway Development in India.

15 marks

Answer

Public-Private Partnership (PPP) models in India's highway sector have been instrumental in bridging the funding gap and improving operational efficiency. The National Highways Authority of India (NHAI) primarily utilizes three key frameworks for road development:

  1. Build-Operate-Transfer (BOT) Toll: The private partner is responsible for financing, constructing, operating, and maintaining the highway for a specified concession period (typically 20-30 years). The developer recovers the investment through toll collection from road users. This model transfers traffic risk entirely to the private entity.
  2. Build-Operate-Transfer (BOT) Annuity: The developer finances and constructs the highway, but the government pays a fixed semi-annual amount (annuity) to the developer over the concession period. Since the government collects the tolls, the developer is shielded from traffic volume risk, making this model more attractive for projects with uncertain traffic projections.
  3. Hybrid Annuity Model (HAM): Introduced to revive private investment, this model combines features of both EPC and BOT. The government contributes 40% of the project cost during construction in five equal installments, while the developer arranges the remaining 60%. The government collects the tolls, and the developer receives the remaining 60% as annuity payments, along with interest and O&M costs, during the operational phase.

Additionally, the Engineering, Procurement, and Construction (EPC) model is used where the government funds 100% of the project, and the private sector is hired only for construction. PPP schemes have evolved to mitigate risks, improve project bankability, and ensure timely delivery of national highway infrastructure by leveraging private sector expertise and capital.

2

Enumerate the factors governing the width of carriage way. State the IRC specifications for width of carriage way for various classes of roads?

15 marks

Answer

The width of the carriage way, also known as the road width or paved width, is determined by the width of the traffic lanes and the number of lanes required to accommodate the design traffic volume. The primary factors governing the width are:

  • Width of vehicle: The maximum permissible width of the widest vehicle (usually 2.44 m) dictates the minimum lane width.
  • Clearance: Additional lateral clearance is required between vehicles and between the vehicle and the edge of the pavement for safety and maneuvering.
  • Design speed: Higher speeds necessitate wider lanes to provide a margin for steering variations and driver comfort.
  • Traffic volume and composition: Higher volumes and a higher percentage of heavy commercial vehicles require wider lanes to prevent congestion and side-swiping.
  • Horizontal curvature: On sharp curves, extra widening is provided to account for the off-tracking of rear wheels of long wheel-base vehicles.
  • Presence of shoulders and curbs: The type of edge treatment influences the effective width required for safe operation.

According to IRC (Indian Roads Congress) specifications, the standard width of a single lane is 3.75 m for a single-lane road and 3.5 m per lane for multi-lane roads. The recommended widths are as follows:

Road ClassificationWidth of Carriage Way
Single lane3.75 m
Two lanes (without raised curbs)7.0 m
Two lanes (with raised curbs)7.5 m
Intermediate carriage way5.5 m
Multi-lane roads3.5 m per lane

For roads with raised curbs, a minimum utility setback or clearance is often required beyond the carriage way width to ensure safety and drainage efficiency.

315 marks
a

Explain summit and valley curves and the various cases when these are formed while two different gradients meet.

7 marks

Answer

Sign in to view the complete answer paper.

b

The speeds of overtaking and overtaken vehicles are 80 and 60 Kmph respectively. If the acceleration of the overtaking vehicle is 2.5 Kmph per second, calculate the safe passing sight distance for i) One way traffic ii) Two way traffic. Enumerate the various design factors controlling the vertical alignment of highways.

8 marks

Answer

Sign in to view the complete answer paper.

4

Explain the direct method of conducting spot speed study with a neat sketch? Also write the advantages and disadvantages of this method. Discuss about the other methods of collecting data.

15 marks

Answer

Sign in to view the complete answer paper.

5

What are the various parking parameters about which data is collected in a parking study? Define and explain them. Explain clearly the method of Parking Inventory Study on a road section.

15 marks

Answer

Sign in to view the complete answer paper.

6

What are the desirable properties of bituminous mixes? What are the steps in bituminous mix design? Discuss briefly.

15 marks

Answer

Sign in to view the complete answer paper.

715 marks
a

A cement concrete pavement 15 cm thick and 7.5 meter width has a longitudinal joint along the centre line. Design the diameter, length and spacing of the tie bars if the allowable working stress in steel is 1800 kg/cm2 in tension, allowable bond strength in concrete is 24.6 kg/cm2 and coefficient of friction is 1.5. Assume unit weight of concrete as 2400 kg/m3.

8 marks

Answer

Sign in to view the complete answer paper.

b

Discuss the conditions under which stresses in cement concrete pavements lead to most critical Combinations.

7 marks

Answer

Sign in to view the complete answer paper.

8

Mention the design steps for overlay thickness design using BBD data.

15 marks

Answer

Sign in to view the complete answer paper.

About this paper

This page contains the question paper of TRANSPORTATION ENGINEERING from JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD for B. Tech CEE III Year I Semester, March - 2021, R18.

For the solved question paper with answers, switch to the Answer Paper tab.

Other papers in TRANSPORTATION ENGINEERING

Loading Question Papers

Fetching data from database...