JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD
JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD B.Tech III POWER SYSTEM OPERATION AND CONTROL Previous Question Paper (February - 2023 - R18)
Note: i) Question paper consists of Part A, Part B. ii) Part A is compulsory, which carries 25 marks. In Part A, Answer all questions. iii) In Part B, Answer any one question from each unit. Each question carries 10 marks and may have a, b as sub questions.
Part A
What is the need for load flow studies?
Answer
Load flow studies are essential for the planning, design, and operation of power systems. They are primarily used to determine the steady-state operating conditions of a power network, including the voltage magnitude and phase angle at each bus, as well as the real and reactive power flows through transmission lines. This information is critical for identifying potential line overloads, ensuring voltage profiles remain within permissible limits, and optimizing system losses for efficient operation.
Explain the merits of N-R (Newton-Raphson) method.
Answer
The Newton-Raphson (N-R) method is widely used for power flow analysis due to the following merits:
- Quadratic Convergence: The method exhibits strong convergence characteristics, meaning the number of iterations required to reach a solution is independent of the system size. This makes it highly efficient for large-scale power systems.
- Reliability: It is extremely robust and reliable, consistently converging for most practical power system conditions, including those with heavy loading or ill-conditioned networks.
- Computational Efficiency: Although each iteration is computationally intensive due to the calculation of the Jacobian matrix, the total time required is minimized because the solution is achieved in very few iterations compared to other methods like Gauss-Seidel.
Define current distribution factor.
Answer
Sign in to view the complete answer paper.
Explain (i) Incremental fuel rate curve (ii) Incremental cost curve.
Answer
Sign in to view the complete answer paper.
What is Q-V control channel?
Answer
Sign in to view the complete answer paper.
What are the basic requirements of a load frequency control?
Answer
Sign in to view the complete answer paper.
What is voltage stability?
Answer
Sign in to view the complete answer paper.
Explain the terms: (i) critical clearing angle (ii) critical clearing time.
Answer
Sign in to view the complete answer paper.
What is power system monitoring?
Answer
Sign in to view the complete answer paper.
Explain the concept of load dispatch centre.
Answer
Sign in to view the complete answer paper.
Part B
For the system shown in figure below, with bus 3 as reference bus, the bus impedance matrix is given by. Start with V1(0) = V2(0) = 1.05 ∠0, and solve for V1 and V2 by the Gauss-Seidel method.
Answer
Sign in to view the complete answer paper.
With a neat flow chart, explain the load flow solution by Newton-Raphson method.
Answer
Sign in to view the complete answer paper.
Derive the transmission line loss formula for a system consisting of n- generating plants supplying several loads interconnected through a transmission network.
Answer
Sign in to view the complete answer paper.
What is penalty factor in economic scheduling? Explain its significance?
Answer
Sign in to view the complete answer paper.
In a two plant system, the entire load is located at plant 2, which is connected to plant 1 by a transmission line. Plant 1 supplies 100 MW of power with a corresponding transmission loss of 5MW. Calculate the penalty factors for the two plants.
Answer
Sign in to view the complete answer paper.
Discuss the dynamic interaction between P-f and Q-V loops.
Answer
Sign in to view the complete answer paper.
Derive the model of a speed governing system and represent it by a block diagram.
Answer
Sign in to view the complete answer paper.
State and explain equal area criterion.
Answer
Sign in to view the complete answer paper.
Discuss the step by step solution of a swing equation.
Answer
Sign in to view the complete answer paper.
The H constant is 5 sec and initially it is delivering a load of 0.5 p.u. Find the critical clearing angle.
Answer
Sign in to view the complete answer paper.
What are the various methods of improving steady state stability? Explain.
Answer
Sign in to view the complete answer paper.
Briefly explain the major components of a SCADA system.
Answer
Sign in to view the complete answer paper.
What is the importance of load forecasting? Explain various techniques of load forecasting.
Answer
Sign in to view the complete answer paper.