JNTU B.Tech III MANAGEMENT SCIENCE Previous Question Paper (December - 2018 - R15)
Note: This question paper contains two parts A and B. Part A is compulsory which carries 25 marks. Answer all questions in Part A. Part B consists of 5 Units. Answer any one full question from each unit. Each question carries 10 marks and may have a, b, c as sub questions.
Part A
What are lesser priority needs in Maslow’s theory?
Answer
In Maslow’s hierarchy, lesser priority needs refer to the higher-level growth needs, specifically Esteem needs and Self-actualization needs, which become motivators only after the lower-level deficiency needs (physiological, safety, and social) are adequately satisfied.
What does POSDCORB stand for?
Answer
POSDCORB stands for Planning, Organizing, Staffing, Directing, Coordinating, Reporting, and Budgeting.
Which type of layout is considered appropriate for single product assembly type of production?
Answer
Sign in to view the complete answer paper.
What is the basis for classification of items into A, B and C categories?
Answer
Sign in to view the complete answer paper.
Distinguish between ‘promotion’ and ‘transfer’.
Answer
Sign in to view the complete answer paper.
What is ranking method of merit rating?
Answer
Sign in to view the complete answer paper.
What is the significance of dummy activity?
Answer
Sign in to view the complete answer paper.
Define Project. What is its essential nature?
Answer
Sign in to view the complete answer paper.
What are SBUs?
Answer
Sign in to view the complete answer paper.
How does vision differ from mission?
Answer
Sign in to view the complete answer paper.
Part B
What is span of control? What are the advantages and disadvantages of wider span of control?
Answer
Sign in to view the complete answer paper.
Define the terms authority and responsibility. How are they related?
Answer
Sign in to view the complete answer paper.
What are the criticisms of principle of scientific management?
Answer
Sign in to view the complete answer paper.
What is matrix organization structure? What are its advantages and disadvantages?
Answer
Sign in to view the complete answer paper.
Under what conditions job order production and mass production methods?
Answer
Sign in to view the complete answer paper.
Calculate EOQ for annual requirement of 50,000 CDs of a music recording company given that each CD costs Rs.10 and ordering cost is Rs. 5000 per order. Inventory carrying cost is 2% of the average value of the inventory per month.
Answer
Sign in to view the complete answer paper.
In a random observation of work sampling procedure, out of 500 observation conducted during a week of 40 hours of work, it was noticed that the worker is not found working 80 times. The worker is rated 110 per cent and in the course of the entire week, 6000 pieces of output have been turned out by the worker. The allowance for this type of work is 15%. Calculate the standard time for the work.
Answer
Sign in to view the complete answer paper.
What is JIT system? What are its advantages and limitations?
Answer
Sign in to view the complete answer paper.
What is the significance of ‘Performance Appraisal’ in HRM?
Answer
Sign in to view the complete answer paper.
What are the various steps in selection process?
Answer
Sign in to view the complete answer paper.
Explain briefly any four of the off-job training methods.
Answer
Sign in to view the complete answer paper.
What are the objectives of merit rating?
Answer
Sign in to view the complete answer paper.
The estimates for various activities in an illustrative project are shown below:
| Activity | Optimistic time estimate (months) | Most likely time estimate (months) | Pessimistic time estimate (months) |
|---|---|---|---|
| 1-2 | 9 | 12 | 21 |
| 1-3 | 6 | 12 | 18 |
| 2-4 | 1 | 1.5 | 5 |
| 3-4 | 4 | 8.5 | 10 |
| 2-5 | 10 | 14 | 24 |
| 4-5 | 1 | 2 | 3 |
Draw a PERT network. Indicate critical path and project duration.
Answer
Sign in to view the complete answer paper.
Calculate slack for each event.
Answer
Sign in to view the complete answer paper.
For the data in the table below draw the network.
| Activity | Normal time (days) | Normal cost (Rs.) | Crash time (days) | Crash cost (Rs.) |
|---|---|---|---|---|
| 1-2 | 8 | 100 | 6 | 200 |
| 1-3 | 4 | 150 | 2 | 350 |
| 2-4 | 2 | 50 | 1 | 90 |
| 2-5 | 10 | 100 | 5 | 400 |
| 3-4 | 5 | 100 | 1 | 200 |
| 4-5 | 3 | 80 | 1 | 100 |
Answer
Sign in to view the complete answer paper.
Crash the activities for optimum cost given that indirect cost is Rs.70 per day. What is the total duration after crashing and the cost?
Answer
Sign in to view the complete answer paper.
What is the importance of value chain analysis?
Answer
Sign in to view the complete answer paper.
What are the aspects to be covered in environmental scanning?
Answer
Sign in to view the complete answer paper.
Briefly state the generic strategies.
Answer
Sign in to view the complete answer paper.
What is bench marking? What are its advantages and the limitations?
Answer
Sign in to view the complete answer paper.