Answer PaperPaper Code: 115CPMaximum Marks: 75Time: 3 hours

Answer any five questions. All questions carry equal marks.

Main

1

What is a shaft Pillar? Describe the different methods of determining shaft pillar size.

15 marks

Answer

A shaft pillar is a solid block of coal left unmined around the shaft bottom to provide structural support and protect the shaft, winding equipment, and surface infrastructure from the effects of ground movement and subsidence caused by underground mining operations. It ensures the stability of the shaft lining and prevents damage to the hoisting system.

The size of the shaft pillar is determined using several empirical, analytical, and numerical methods:

  1. Empirical Methods: These rely on historical data and rules of thumb. A common approach is the Angle of Draw method, where the pillar boundary is defined by projecting a line from the shaft at a specific angle (usually 35 to 45 degrees) from the vertical, extending to the surface or the seam level to encompass the zone of influence.
  2. Rule of Thumb Formulas: Various formulas based on shaft depth (D) are used. For example, a common rule is that the radius of the pillar should be at least 0.35 times the depth of the shaft, or a minimum of 30 to 50 meters, depending on the strata conditions and seam thickness.
  3. Analytical Methods: These involve stress analysis calculations. The pillar must be large enough to ensure that the vertical stress induced by the weight of the overburden and the redistributed stresses from mining do not exceed the compressive strength of the coal seam, considering a suitable Factor of Safety (typically 2.0 to 3.0 for critical infrastructure).
  4. Numerical Modeling: Modern methods use software (such as Finite Element Method or Boundary Element Method) to simulate the stress distribution and displacement around the shaft. This allows for a site-specific assessment by modeling the geological properties, seam thickness, and mining sequence to optimize pillar size while ensuring safety.
  5. Statutory Requirements: In many jurisdictions, mining regulations specify minimum pillar dimensions based on the depth of the shaft and the nature of the overlying strata to ensure legal compliance and safety standards.
215 marks
a

What are the statutory provisions with respect to the Bord and Pillar development?

7 marks

Answer

Statutory provisions for Bord and Pillar development in India are governed by the Coal Mines Regulations (CMR), 2017. Key requirements include:

  • Size of Pillars: Pillars must be of such size that they can withstand the pressure of the overlying strata and prevent premature collapse. Minimum dimensions are often specified based on depth of cover.
  • Gallery Width: The maximum width of galleries is restricted to 4.8 meters to ensure roof stability.
  • Ventilation: Development must ensure a continuous flow of air to all working faces to dilute methane and dust.
  • Support Systems: Systematic support rules (SSR) must be implemented, requiring specific patterns of roof bolting or props based on the geological classification of the roof.
  • Barrier Pillars: Large barrier pillars must be left between panels to prevent the spread of fire, inundation, or gas.
  • Supervision: All development faces must be under the direct supervision of a certified Sirdar or Overman.
b

Explain the horizon mining along with its advantages and disadvantages.

8 marks

Answer

Sign in to view the complete answer paper.

315 marks
a

What are the different ways of drivages of galleries?

7 marks

Answer

Sign in to view the complete answer paper.

b

Explain the development by Blasting off the Solid along its statutory conditions to be fulfilled.

8 marks

Answer

Sign in to view the complete answer paper.

4

Explain the principle and design of extraction pillars with simple sketches.

15 marks

Answer

Sign in to view the complete answer paper.

5

Explain a Continuous Miner panel layout with the list of equipment used for a production of 2.6 million tonnes per annum.

15 marks

Answer

Sign in to view the complete answer paper.

615 marks
a

Explain about Shape and size of development of gate roadways.

7 marks

Answer

Sign in to view the complete answer paper.

b

Describe about gate roads and their maintenance.

8 marks

Answer

Sign in to view the complete answer paper.

7

Discuss about the length and orientation of long wall faces in Indian Coal Mines.

15 marks

Answer

Sign in to view the complete answer paper.

8

Describe Strata Monitoring Plan in a Longwall Retreating Method. List different strata monitoring instruments used in LW method.

15 marks

Answer

Sign in to view the complete answer paper.

About this paper

This page contains the question paper of UNDERGROUND COAL MINING TECHNOLOGY from JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD for B.Tech MNE-MIE III I, February - 2022, R13.

For the solved question paper with answers, switch to the Answer Paper tab.

Other papers in UNDERGROUND COAL MINING TECHNOLOGY

Loading Question Papers

Fetching data from database...