JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD B. Tech IV Year ADVANCED SURFACE MINING Previous Question Paper (February/March - 2022 - R18)
Answer Any Five Questions. All Questions carry equal marks.
Main
Discuss the Ultimate pit configuration and its determination.
Answer
The determination of the ultimate pit involves the following key considerations:
- Economic Parameters: Estimation of commodity prices, mining costs (drilling, blasting, loading, hauling), processing costs, and refining charges.
- Geotechnical Constraints: Determination of the overall pit slope angle, which must ensure safety against wall failure while minimizing the stripping ratio.
- Cut-off Grade: Defining the minimum grade of ore that can be profitably extracted, which dictates the ore-waste boundary.
- Block Modeling: The deposit is discretized into a 3D grid of blocks, each assigned a value based on its grade, tonnage, and associated costs.
Analyze Lerchs-Grossmann algorithm.
Answer
Key aspects of the algorithm include:
- Graph Representation: The ore body is represented as a set of nodes (blocks). Directed edges are drawn between blocks to represent precedence constraints; for instance, a block cannot be mined unless the blocks directly above it are removed to satisfy slope stability requirements.
- Optimization Logic: The algorithm identifies a subset of blocks (a closure) such that if a block is included, all its predecessors are also included. It seeks to maximize the sum of the values of these blocks.
- Dynamic Programming and Flow Networks: It effectively transforms the mining problem into a minimum-cut/maximum-flow problem. By finding the minimum cut in the network, the algorithm identifies the optimal boundary that separates the profitable pit from the surrounding waste rock.
- Advantages: Unlike heuristic methods (such as moving cones), the LG algorithm guarantees a mathematically optimal solution for a given set of economic and geotechnical inputs.
- Limitations: While computationally intensive for very large block models, modern computing power has made it the industry standard for strategic mine planning. It does not inherently account for the time value of money, which is typically addressed in subsequent production scheduling phases.
Illustrate Pit cut-off grade and its estimation.
Answer
Sign in to view the complete answer paper.
Explain production scheduling.
Answer
Sign in to view the complete answer paper.
Discuss the influence of pit slope on mine economics.
Answer
Sign in to view the complete answer paper.
Explain slope stability analysis including mine waste rock dumps and tailing dumps.
Answer
Sign in to view the complete answer paper.
Evaluate the stability analysis and design methodology for waste dumps.
Answer
Sign in to view the complete answer paper.
Explain the determination of mine size and sequencing by nested pits.
Answer
Sign in to view the complete answer paper.
Illustrate the power supply arrangements in opencast mines.
Answer
Sign in to view the complete answer paper.
Discuss the computerized truck dispatch.
Answer
Sign in to view the complete answer paper.
Analyze the Computations for the capacity and number of machines for mine production.
Answer
Sign in to view the complete answer paper.
Explain the impact of surface subsidence.
Answer
Sign in to view the complete answer paper.
Discuss various accidents in surface mining and their prevention.
Answer
Sign in to view the complete answer paper.
Explain the scope of applicability for placer mining and solution mining in detail.
Answer
Sign in to view the complete answer paper.