Jawaharlal Nehru Technological University Hyderabad
Jawaharlal Nehru Technological University Hyderabad B.Tech III WELL COMPLETION, TESTING AND SERVICING Previous Question Paper (August - 2022 - R18)
Answer any five questions. All questions carry equal marks.
Main
Illustrate the main functions of well completion.
Answer
Well completion is the process of preparing a well for the production of oil or gas or for injection purposes. Its primary functions include:
- Zonal Isolation: Preventing fluid communication between different geological formations to avoid contamination or loss of production.
- Formation Protection: Ensuring the stability of the wellbore and preventing sand production or formation damage during fluid flow.
- Flow Control: Regulating the flow of reservoir fluids to the surface and enabling the ability to shut off production from specific zones if required.
- Artificial Lift Integration: Facilitating the installation of artificial lift systems (such as ESPs or gas lift) to sustain production rates as reservoir pressure declines.
- Monitoring and Surveillance: Providing access for downhole pressure and temperature measurements to evaluate reservoir performance.
Describe the factors to be considered for selecting well completion mode and method.
Answer
The selection of a completion mode (e.g., open-hole, cased-hole, or gravel pack) and method depends on several technical and economic factors:
- Reservoir Characteristics: The permeability, porosity, and heterogeneity of the formation dictate the required flow capacity and potential for sand production.
- Fluid Properties: The viscosity, gas-oil ratio (GOR), and the presence of corrosive elements like H2S or CO2 influence the choice of materials and completion equipment.
- Well Geometry: The inclination (vertical, deviated, or horizontal) and depth of the well significantly impact the mechanical feasibility of specific completion strings.
- Economic Considerations: The expected production life of the well, capital expenditure (CAPEX) for equipment, and anticipated operational expenditure (OPEX) for future workovers must be balanced against projected revenue.
- Future Intervention Needs: The requirement for future stimulation (e.g., acidizing or fracturing) or the need to switch production zones necessitates a flexible completion design.
- Regulatory and Safety Requirements: Compliance with environmental standards and safety protocols regarding well integrity and pressure control is mandatory.
What is the role of the completion engineer, and broadly explain different barrier systems through the life of the well with examples.
Answer
Sign in to view the complete answer paper.
Present briefly Cased hole logging equipment and its application.
Answer
Sign in to view the complete answer paper.
Discuss the main parameters affecting the productivity of the zone produced by perforating.
Answer
Sign in to view the complete answer paper.
Discuss the basic typical steps in a cased-hole gravel pack.
Answer
Sign in to view the complete answer paper.
Illustrate the factors to be consider for selecting well completion mode and method.
Answer
Sign in to view the complete answer paper.
Delineate the packer setting mechanism and write the advantage, drawbacks of permanent packers.
Answer
Sign in to view the complete answer paper.
Write short note on water / gas shut off in oil wells.
Answer
Sign in to view the complete answer paper.
Discuss about Proper selection packers and Packer setting.
Answer
Sign in to view the complete answer paper.
Classify various permanent production packers; explain setting of 415 D packers on the electric cable.
Answer
Sign in to view the complete answer paper.
Summarize the parameters consider in tubing string design. Discuss the selection of tubing material based on corrosive media present.
Answer
Sign in to view the complete answer paper.
Differentiate between Permanent gauges and Memory gauges.
Answer
Sign in to view the complete answer paper.
What are the importance of scrubbing unit in well completion, and explain its applications?
Answer
Sign in to view the complete answer paper.
Present briefly the procedure required to execute a horizontal well during work over.
Answer
Sign in to view the complete answer paper.