JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD
JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD B.Tech III WELL COMPLETION, TESTING AND SERVICING Previous Question Paper (August/September - 2021 - R18)
Answer any five questions
All questions carry equal marks
Main
What is the main purpose of development wells? Explain different types of development wells?
Answer
The main purpose of development wells is to exploit a proven hydrocarbon reservoir by establishing a production path from the reservoir to the surface. These wells are drilled within the boundaries of a discovered field to maximize recovery, maintain reservoir pressure, or efficiently drain the reservoir based on the established geological model.
Types of development wells include:
- Production Wells: Drilled to extract oil or gas from the reservoir to the surface.
- Injection Wells: Used to inject fluids such as water, gas, or steam into the reservoir to maintain pressure and improve the recovery factor of hydrocarbons.
- Infill Wells: Drilled between existing production wells to tap into bypassed pay zones or to increase the drainage efficiency of the reservoir.
- Observation Wells: Drilled to monitor reservoir pressure, fluid contacts, and saturation changes over time without producing fluids.
Depict the conventional single-zone completion with neat sketches.
Answer
A conventional single-zone completion is the simplest method of completing a well, where a single reservoir interval is produced through one tubing string. The completion assembly typically consists of a production packer, a landing nipple, and a production tubing string.
The configuration functions as follows:
- Production Packer: Set above the producing zone to isolate the annulus between the tubing and the casing, preventing fluid communication and protecting the casing from corrosive well fluids.
- Production Tubing: The conduit through which reservoir fluids flow to the surface.
- Landing Nipple: Installed in the tubing string to allow for the placement of flow control devices like plugs or chokes.
- Perforations: The casing and cement are perforated across the target zone to allow reservoir fluids to enter the wellbore.
Visually, the arrangement shows the casing string extending to the total depth, with the production tubing suspended inside. The packer is anchored against the casing wall just above the perforated interval, ensuring that all produced fluids are directed solely into the tubing string while the casing-tubing annulus remains filled with a completion fluid.
Discuss the various components of production well head.
Answer
Sign in to view the complete answer paper.
How to determine the nominal pipe diameter, grade and nominal weight of tubing?
Answer
Sign in to view the complete answer paper.
Explain how to installing the Christmas tree and bringing the well on stream.
Answer
Sign in to view the complete answer paper.
What are the general considerations of the flowing well equipment?
Answer
Sign in to view the complete answer paper.
Discuss the tubing less completions with neat sketches.
Answer
Sign in to view the complete answer paper.
Explain the gas influx behavior in open well as well as closed well migration.
Answer
Sign in to view the complete answer paper.
Design a tubing string for a 5,000-ft hydro pressured vertical well that is relatively straight, that will be used to flow 300 BOPD, and that will be completed inside 4 1/2-11.60-K55 casing. The well is to be completed with compression-set type packer and 9.0 ppg inhibited salt water in annulus. An overpull to free the packer of 10,000 lbf is anticipated. A maximum surface-treating pressure of 2,000 psi is expected.
Answer
Sign in to view the complete answer paper.
Describe the hydraulically set retrievable packers with block diagram.
Answer
Sign in to view the complete answer paper.
What are the advantages and drawbacks of permanent packers?
Answer
Sign in to view the complete answer paper.
Explain in detail the limitations of tubing outside diameter.
Answer
Sign in to view the complete answer paper.
Describe the considerations of tubing design.
Answer
Sign in to view the complete answer paper.
Describe the workover equipment wireline and its uses.
Answer
Sign in to view the complete answer paper.
Depict briefly the horizontal well completions.
Answer
Sign in to view the complete answer paper.