What is detailed estimate.
Answer
A detailed estimate is an accurate and comprehensive calculation of the total cost of a construction project. It is prepared by working out the quantities of various items of work individually, multiplying them by their respective unit rates, and adding provisions for contingencies, work-charged establishment, and contractor profit.
This estimate is typically prepared after the technical sanction of the preliminary estimate and is essential for inviting tenders, arranging contracts, and exercising financial control during the execution of the project.
What is Plinth area method of estimate?
Answer
The Plinth Area Method is a preliminary or approximate method of estimation used to determine the cost of a building project during its initial planning stages. It is based on the plinth area of the building, which is the built-up covered area measured at the floor level of the basement or any story.
The calculation is performed by multiplying the plinth area of the building by the plinth area rate, which is derived from the cost of similar buildings recently constructed in the same locality. This method provides a quick estimate for administrative approval and budget allocation but does not account for detailed specifications or variations in building height and quality.
What is the purpose of bar bending schedule?
Answer
Sign in to view the complete answer paper.
Find the volume of earth work in embankment of length 10m. Top width is 5.0m and depth is 2.0m the side slopes are 1.5:1.
Answer
Sign in to view the complete answer paper.
What is rate analysis?
Answer
Sign in to view the complete answer paper.
Explain how the rate analysis of labour and material considered.
Answer
Sign in to view the complete answer paper.
Distinguish between detailed and general specifications.
Answer
Sign in to view the complete answer paper.
What is Depreciation and Escalation?
Answer
Sign in to view the complete answer paper.
What is critical path?
Answer
Sign in to view the complete answer paper.
Explain the following: i) Optimistic time ii) pessimistic time iii) Most likely time estimate.
Answer
Sign in to view the complete answer paper.
PART - B
Compare the rough estimate and detailed estimate, when will they be used?
Answer
Sign in to view the complete answer paper.
Discuss in detail about the center line method of estimate.
Answer
Sign in to view the complete answer paper.
Discuss about the detailed specifications for earth work excavations, filling and backfilling.
Answer
Sign in to view the complete answer paper.
What is meant by Bar Bending Schedule and discuss about the general principles to be followed and advantages of bar bending schedule to estimate the quantity of steel.
Answer
Sign in to view the complete answer paper.
Discuss rates of a particular item of work. What are the factor that affect rates of as particular item?
Answer
Sign in to view the complete answer paper.
Prepare a rate analysis for the following items: i) 12mm thick plaster 1:6 cement mortar ii) First class brick work in super structure 1:3 lime cement mortar.
Answer
Sign in to view the complete answer paper.
Calculate the Quantity of Cement required in bags for the following items of work.
C.C. (1:4:8) using 40mm HBG metals for 30m3 of work.
Answer
Sign in to view the complete answer paper.
RR masonry in CM(1:5) using 0.34m3 of CM for 1m3 of masonry for 20m3 of work.
Answer
Sign in to view the complete answer paper.
Write the detailed specifications for plastering and brick work of building.
Answer
Sign in to view the complete answer paper.
What are the details of a contract document must contain, discuss in detail.
Answer
Sign in to view the complete answer paper.
What are different elements present in PERT network and explain with an example.
Answer
Sign in to view the complete answer paper.
Discuss about event, activity and rules for drawing network diagrams.
Answer
Sign in to view the complete answer paper.