JNTU B.Tech III PRODUCTION PLANNING AND CONTROL Previous Question Paper (February - 2023 - R18)
Note: i) Question paper consists of Part A, Part B. ii) Part A is compulsory, which carries 25 marks. In Part A, Answer all questions. iii) In Part B, Answer any one question from each unit. Each question carries 10 marks and may have a, b as sub questions.
Part A
The table below indicates the monthly demand for the six months period for a product.
| Month | 1 | 2 | 3 | 4 | 5 | 6 |
|---|---|---|---|---|---|---|
| Demand (Units) | 125 | 130 | 105 | 145 | 115 | 130 |
Determine the sales forecast for the 7th month, using a 3 month simple moving average method.
Answer
The 3-month simple moving average for the 7th month is calculated by taking the average of the demands for months 4, 5, and 6:
Forecast = (145 + 115 + 130) / 3 = 390 / 3 = 130 units.
How can one evaluate the Production Planning and Control (PPC) function?
Answer
PPC function evaluation is performed by measuring performance against set objectives using key performance indicators (KPIs) such as:
- Schedule Adherence: Comparing actual production output against the planned production schedule.
- Inventory Turnover: Assessing how efficiently inventory is being utilized to meet demand.
- Resource Utilization: Analyzing the capacity utilization of machines and labor to identify bottlenecks or idle time.
Distinguish between Independent and Dependent demand in inventory management.
Answer
Sign in to view the complete answer paper.
Distinguish between in-process inventory, safety stock inventory and seasonal inventory.
Answer
Sign in to view the complete answer paper.
Distinguish between pure and mixed strategies in production planning.
Answer
Sign in to view the complete answer paper.
Explain briefly the Just-in-time inventory system (JIT).
Answer
Sign in to view the complete answer paper.
What is Line of Balance (LOB)?
Answer
Sign in to view the complete answer paper.
Distinguish between finite and infinite loading and forward and backward scheduling.
Answer
Sign in to view the complete answer paper.
Explain the main activities of a dispatcher.
Answer
Sign in to view the complete answer paper.
Comment upon the significance of material follow-up role of the purchase department.
Answer
Sign in to view the complete answer paper.
Part B
Explain diagrammatically the production/operations management cycle and explain the levels of production planning in detail.
Explain diagrammatically the production/operations management cycle.
Answer
Sign in to view the complete answer paper.
Explain the levels of production planning in detail.
Answer
Sign in to view the complete answer paper.
Discuss the steps in the Delphi method of forecasting.
Answer
Sign in to view the complete answer paper.
XYZ company used simple exponential method using an exponential smoothing constant of 0.25 to forecast the short term demand. The forecast for the month of January was 1,000 units whereas the actual sales were only 900 units. What is the forecast for the month of August?
Answer
Sign in to view the complete answer paper.
Briefly explain VED analysis.
Answer
Sign in to view the complete answer paper.
Magnum Enterprises requires 90,000 units of a certain item annually. It costs Rs.3 per unit. The cost per purchase order is Rs.300 and the inventory carrying cost is Rs.20 percent per year. i) What is the EOQ if there is no discount? ii) What should the firm do if the supplier offers discounts as below?
| Order quantity | Discount(%) |
|---|---|
| 4,500-5,999 | 2 |
| 6,000 and above | 3 |
Answer
Sign in to view the complete answer paper.
Pranit Engineering Contractors (PEC) creates six-month “rolling” schedules which are recomputed monthly. For competitive reasons PEC does not subcontract. Therefore, its only options to meet customer requirements are (a) work on regular time; (b) work on over time, which is limited to 30 percent of regular time; (c) do customers’ work early, which would cost an additional Rs. 50 per hour per month.; and (d) perform customers’ work late, which would cost an additional Rs. 100 per month penalty, as provided by their contract. PEC has 25 engineers on its staff at an hourly rate of Rs.300. The overtime rate is Rs.450. Customers’ hourly requirements for the six months from January to June are: January: 5,000; February: 4,000; March: 6,000; April: 6,000; May: 5,000; June: 4,000. Develop an aggregate plan using a spreadsheet. Assume 20 working days in each month.
Answer
Sign in to view the complete answer paper.
The following tasks must be performed on an assembly line in the sequence and times specified. a) Draw the schematic diagram. b) What is the theoretical minimum number of stations required to meet a forecast demand of 400 units per eight-hour day? c) Use the longest-task-time and balance the line in the minimum number of stations to produce 400 units per day.
| Task | Task time (Seconds) | Immediate predecessor |
|---|---|---|
| A | 50 | - |
| B | 40 | - |
| C | 20 | A |
| D | 45 | C |
| E | 20 | C |
| F | 25 | D |
| G | 10 | E |
| H | 35 | B,F,G |
Answer
Sign in to view the complete answer paper.
Explain the use of route sheet as a common production management tool.
Answer
Sign in to view the complete answer paper.
How is an operation and route sheet different from a process flow chart? Explain taking a suitable example.
Answer
Sign in to view the complete answer paper.
What do you understand by scheduling? Discuss the different approaches to scheduling.
Answer
Sign in to view the complete answer paper.
There are six jobs which must go through two machines A and B in the order AB. Obtain the optimal sequence of the jobs and the elapsed time.
| Jobs | 1 | 2 | 3 | 4 | 5 | 6 |
|---|---|---|---|---|---|---|
| Machine A | 8 | 10 | 11 | 12 | 16 | 20 |
| Machine B | 7 | 5 | 0 | 14 | 3 | 9 |
Answer
Sign in to view the complete answer paper.
Distinguish between Loading and Dispatching.
Answer
Sign in to view the complete answer paper.
Explain the following single criterion sequencing rules in detail: i) FCFS ii) SPT iii) EDD iv) LPT
Answer
Sign in to view the complete answer paper.
Discuss in detail the dispatching procedures and various forms used in dispatching.
Answer
Sign in to view the complete answer paper.
How does the expediting function play a crucial role in keeping the job moving through the production facility on time?
Answer
Sign in to view the complete answer paper.
Discuss the applications of computers in planning and control.
Answer
Sign in to view the complete answer paper.