JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD

JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD B.Tech IV MINE PLANNING Previous Question Paper (December - 2019 - R16)

B.Tech | IV | I | R16 | December - 2019

Answer PaperPaper Code: 137EQMaximum Marks: 75Time: 3 Hours

Note: This question paper contains two parts A and B. Part A is compulsory which carries 25 marks. Answer all questions in Part A. Part B consists of 5 Units. Answer any one full question from each unit. Each question carries 10 marks and may have a, b as sub questions.

PART - A

125 marks
a

State at least four technical factors to be considered in mine planning.

2 marks

Answer

Four technical factors for mine planning are: 1) Geological characteristics of the deposit, 2) Geotechnical properties of the host rock and ore, 3) Mining method selection, and 4) Equipment selection and capacity requirements.

b

Explain briefly the inputs required for short range mine planning.

3 marks

Answer

Short-range mine planning requires inputs such as detailed geological data (grade control models), current face positions, equipment availability and performance metrics, operational constraints (e.g., safety, ventilation), and production targets for the specific period (daily, weekly, or monthly).

c

What is feasibility report?

2 marks

Answer

Sign in to view the complete answer paper.

d

What is cost control? Explain it briefly.

3 marks

Answer

Sign in to view the complete answer paper.

e

What is box cut? What is its purpose?

2 marks

Answer

Sign in to view the complete answer paper.

f

Explain briefly the importance of geometry in open cast mining.

3 marks

Answer

Sign in to view the complete answer paper.

g

What is significance of sieve analysis for location of mine entries?

2 marks

Answer

Sign in to view the complete answer paper.

h

What factors influence the size of a panel? Explain them briefly.

3 marks

Answer

Sign in to view the complete answer paper.

i

What are the factors to be considered for selection of Bucket Wheel Excavator in open cast mining?

2 marks

Answer

Sign in to view the complete answer paper.

j

Explain briefly the latest technological developments of shovels in open cast mining.

3 marks

Answer

Sign in to view the complete answer paper.

PART - B

2

What is long range mine planning? What are various parameters to be considered for long range mine planning for open cast coal mining projects? Explain them in detail.

10 marks

Answer

Sign in to view the complete answer paper.

OR
3

Why mine modeling is required in mine planning? What are the factors to be considered in mine modeling for an underground coal mine, when it is planned to extract coal seam by fully mechanized L/W mining.

10 marks

Answer

Sign in to view the complete answer paper.

4

What is detailed project report (DPR)? Explain in detail, various parameters to be considered for preparing a DPR for an open cast metal mine. Assume relevant data, wherever necessary.

10 marks

Answer

Sign in to view the complete answer paper.

OR
5

Why environmental impact assessment is required? What are the parameters to be considered for preparing it? Explain them in detail, with suitable examples.

10 marks

Answer

Sign in to view the complete answer paper.

6

What are the factors to be considered for design of haul roads in open cast mines? Explain them in detail.

10 marks

Answer

Sign in to view the complete answer paper.

OR
7

Explain in detail, with suitable figures, the factors to be considered for open pit limits.

10 marks

Answer

Sign in to view the complete answer paper.

8

Explain in detail, with suitable figure, how optimum production of an underground coal mine is determined? Assume relevant data, wherever necessary.

10 marks

Answer

Sign in to view the complete answer paper.

OR
9

What is techno – economic analysis? Explain in detail, with suitable diagrams, how it is done for an underground metal mine. Assume relevant data, wherever necessary.

10 marks

Answer

Sign in to view the complete answer paper.

10

Explain in detail, the factors to be considered for selection of shovel – dumper combination in an open cast mine.

10 marks

Answer

Sign in to view the complete answer paper.

OR
11

Write short notes on:

10 marks
a

Selection of mining equipment and performance monitoring.

5 marks

Answer

Sign in to view the complete answer paper.

b

Latest technological developments of dumpers used in open cast mines.

5 marks

Answer

Sign in to view the complete answer paper.

About this paper

This page contains the question paper of MINE PLANNING from JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD for B.Tech MNE-MIE IV I, December - 2019, R16.

For the solved question paper with answers, switch to the Answer Paper tab.

Other papers in MINE PLANNING

Loading Question Papers

Fetching data from database...