State at least four technical factors to be considered in mine planning.
Answer
Four technical factors for mine planning are: 1) Geological characteristics of the deposit, 2) Geotechnical properties of the host rock and ore, 3) Mining method selection, and 4) Equipment selection and capacity requirements.
Explain briefly the inputs required for short range mine planning.
Answer
Short-range mine planning requires inputs such as detailed geological data (grade control models), current face positions, equipment availability and performance metrics, operational constraints (e.g., safety, ventilation), and production targets for the specific period (daily, weekly, or monthly).
What is feasibility report?
Answer
Sign in to view the complete answer paper.
What is cost control? Explain it briefly.
Answer
Sign in to view the complete answer paper.
What is box cut? What is its purpose?
Answer
Sign in to view the complete answer paper.
Explain briefly the importance of geometry in open cast mining.
Answer
Sign in to view the complete answer paper.
What is significance of sieve analysis for location of mine entries?
Answer
Sign in to view the complete answer paper.
What factors influence the size of a panel? Explain them briefly.
Answer
Sign in to view the complete answer paper.
What are the factors to be considered for selection of Bucket Wheel Excavator in open cast mining?
Answer
Sign in to view the complete answer paper.
Explain briefly the latest technological developments of shovels in open cast mining.
Answer
Sign in to view the complete answer paper.
PART - B
What is long range mine planning? What are various parameters to be considered for long range mine planning for open cast coal mining projects? Explain them in detail.
Answer
Sign in to view the complete answer paper.
Why mine modeling is required in mine planning? What are the factors to be considered in mine modeling for an underground coal mine, when it is planned to extract coal seam by fully mechanized L/W mining.
Answer
Sign in to view the complete answer paper.
What is detailed project report (DPR)? Explain in detail, various parameters to be considered for preparing a DPR for an open cast metal mine. Assume relevant data, wherever necessary.
Answer
Sign in to view the complete answer paper.
Why environmental impact assessment is required? What are the parameters to be considered for preparing it? Explain them in detail, with suitable examples.
Answer
Sign in to view the complete answer paper.
What are the factors to be considered for design of haul roads in open cast mines? Explain them in detail.
Answer
Sign in to view the complete answer paper.
Explain in detail, with suitable figures, the factors to be considered for open pit limits.
Answer
Sign in to view the complete answer paper.
Explain in detail, with suitable figure, how optimum production of an underground coal mine is determined? Assume relevant data, wherever necessary.
Answer
Sign in to view the complete answer paper.
What is techno – economic analysis? Explain in detail, with suitable diagrams, how it is done for an underground metal mine. Assume relevant data, wherever necessary.
Answer
Sign in to view the complete answer paper.
Explain in detail, the factors to be considered for selection of shovel – dumper combination in an open cast mine.
Answer
Sign in to view the complete answer paper.
Write short notes on:
Selection of mining equipment and performance monitoring.
Answer
Sign in to view the complete answer paper.
Latest technological developments of dumpers used in open cast mines.
Answer
Sign in to view the complete answer paper.