JNTU

JNTU MCA 2018 SOFTWARE PROCESS AND PROJECT MANAGEMENT Previous Question Paper (January - 2018 - R15)

MCA | 2018 | IV | R15 | January - 2018

Answer PaperPaper Code: 824AGMaximum Marks: 75Time: 3hrs

Note: This question paper contains two parts A and B. Part A is compulsory which carries 25 marks. Answer all questions in Part A. Part B consists of 5 Units. Answer any one full question from each unit. Each question carries 10 marks and may have a, b, c as sub questions.

Part A

5 x 5 Marks = 25

125 marks
a

What are the improvements done to the basic waterfall model that would eliminate most of the development risks?

5 marks

Answer

The basic waterfall model is improved by incorporating iterative development, risk management, and prototyping. By breaking the project into smaller iterations, teams can identify and address technical risks early. Continuous integration and frequent testing ensure that defects are caught during development rather than at the end, while stakeholder feedback loops allow for requirement validation, significantly reducing the risk of building the wrong product.

b

Give the top five principles of a modern process.

5 marks

Answer

  1. Architecture-first approach: Prioritizing the design of a robust system structure.
  2. Iterative life-cycle process: Managing development through repeated cycles of refinement.
  3. Component-based development: Focusing on modular, reusable software parts.
  4. Change management: Implementing controlled processes to handle evolving requirements.
  5. Round-trip engineering: Maintaining synchronization between design models and source code.
c

What are the primary objectives of inception phase?

5 marks

Answer

Sign in to view the complete answer paper.

d

What will be the impact of periodic status assessments on software project?

5 marks

Answer

Sign in to view the complete answer paper.

e

List out the differences in workflow priorities between small and large projects.

5 marks

Answer

Sign in to view the complete answer paper.

Part B

5 x 10 Marks = 50

2

Describe the performance of conventional software project management.

10 marks

Answer

Sign in to view the complete answer paper.

OR
3

What are the characteristics of a good estimate? Explain its role and significance in pragmatic software cost estimation.

10 marks

Answer

Sign in to view the complete answer paper.

4

Explain the steps to improve team effectiveness with relevant examples.

10 marks

Answer

Sign in to view the complete answer paper.

OR
5

Discuss the top risks involved in conventional software process and how can a modern software process resolves these risks.

10 marks

Answer

Sign in to view the complete answer paper.

6

Describe the differences in emphasis between engineering stage and production stage.

10 marks

Answer

Sign in to view the complete answer paper.

OR
710 marks
a

Give typical release specification outline.

5 marks

Answer

Sign in to view the complete answer paper.

b

Summarize the artifacts of the design set with neat UML diagram.

5 marks

Answer

Sign in to view the complete answer paper.

8

Describe the artifacts and life-cycle emphases associated with seven workflows of a software process.

10 marks

Answer

Sign in to view the complete answer paper.

OR
910 marks
a

What are the various levels of the evolutionary Work break down structure?

5 marks

Answer

Sign in to view the complete answer paper.

b

Discuss the activities of software architecture team.

5 marks

Answer

Sign in to view the complete answer paper.

1010 marks
a

What social factors are observed on software projects?

5 marks

Answer

Sign in to view the complete answer paper.

b

Give life cycle overview of CCPDS-R project.

5 marks

Answer

Sign in to view the complete answer paper.

OR
11

Explain about SLOC-to-ESLOC conversion factors that measures the performance of CCPDS-R project.

10 marks

Answer

Sign in to view the complete answer paper.

About this paper

This page contains the question paper of SOFTWARE PROCESS AND PROJECT MANAGEMENT from JNTU for MCA 2018 IV, January - 2018, R15.

For the solved question paper with answers, switch to the Answer Paper tab.

Other papers in SOFTWARE PROCESS AND PROJECT MANAGEMENT

Loading Question Papers

Fetching data from database...