JNTU MCA 2020 SOFTWARE PROCESS AND PROJECT MANAGEMENT Previous Question Paper (October/ November - 2020 - R17)

MCA | 2020 | IV | R17 | October/ November - 2020

Answer PaperPaper Code: 844AGMaximum Marks: 75Time: 2 Hours

Answer any five questions. All questions carry equal marks.

Main

1

What are the characteristics of repeatable process? Discuss the key actions required to advance from repeatable process to defined process.

15 marks

Answer

In the Capability Maturity Model (CMM), the Repeatable Process (Level 2) represents a stage where basic project management processes are established to track cost, schedule, and functionality. Its primary characteristics include:

  • Disciplined Management: Projects are planned and managed according to documented procedures, ensuring that successes can be repeated on similar projects.
  • Commitment and Accountability: Realistic project commitments are based on the results observed on previous projects, and management actively tracks progress against these plans.
  • Requirement Management: Software requirements are established and maintained, and changes to requirements are controlled to prevent scope creep.
  • Subcontractor Management: There is a formal process for selecting and managing third-party software subcontractors.
  • Quality Assurance: Software quality assurance activities are performed to ensure that the process is followed and that the resulting products meet standards.

To advance from the Repeatable Process (Level 2) to the Defined Process (Level 3), an organization must transition from project-specific management to an organization-wide standard process. The key actions required are:

  1. Establishment of a Standard Process: The organization must define, document, and integrate a standard software process that covers all software engineering and management activities. This serves as the baseline for all projects.
  2. Tailoring Guidelines: Develop formal procedures that allow individual projects to tailor the organizational standard process to meet their specific needs while maintaining compliance with the core framework.
  3. Organizational Training: Implement a comprehensive training program to ensure that all staff members possess the skills and knowledge required to execute the defined standard process effectively.
  4. Process Focus: Create a dedicated group, such as a Software Engineering Process Group (SEPG), responsible for the organization's software process activities, including process definition and improvement.
  5. Integrated Engineering: Integrate software engineering activities (such as design, coding, and testing) with project management activities, ensuring that technical and management processes work in harmony across the entire organization.
215 marks
a

Discuss the critical problems in software cost estimation.

8 marks

Answer

Software cost estimation is inherently difficult due to the intangible nature of software and the high degree of uncertainty in project requirements. The critical problems include:

  • Requirement Volatility: Software requirements often change during development, making it difficult to establish a stable baseline for estimation.
  • Lack of Historical Data: Many organizations fail to maintain accurate records of past projects, leading to estimations based on guesswork rather than empirical evidence.
  • Human Factors: Productivity varies significantly among developers based on skill, experience, and motivation, which is difficult to quantify.
  • Technological Complexity: The rapid evolution of tools, frameworks, and programming languages introduces unpredictable learning curves and integration challenges.
  • Optimism Bias: Project managers often underestimate the time required for testing, debugging, and documentation, leading to overly optimistic schedules.
  • Communication Overhead: As team size increases, the complexity of communication grows exponentially, which is frequently overlooked in initial estimates.
b

List the attributes of a good estimate of software cost.

7 marks

Answer

Sign in to view the complete answer paper.

3

What is the need of checkpoints of the process? Illustrate a typical sequence of project checkpoints of a relatively large project.

15 marks

Answer

Sign in to view the complete answer paper.

4

Show the focus of software assessment team activities over the project life cycle.

15 marks

Answer

Sign in to view the complete answer paper.

515 marks
a

Debate between source lines of code and function points.

8 marks

Answer

Sign in to view the complete answer paper.

b

Describe the role of inspections and walkthroughs in software management.

7 marks

Answer

Sign in to view the complete answer paper.

615 marks
a

List the basic principles of software process assessment.

8 marks

Answer

Sign in to view the complete answer paper.

b

Discuss the common misconception about software process.

7 marks

Answer

Sign in to view the complete answer paper.

7

Explain artifact evolution over the software development life cycle.

15 marks

Answer

Sign in to view the complete answer paper.

8

Give the information structure provided by work break down structure. Discuss the fundamental flaws in conventional work break down structures.

15 marks

Answer

Sign in to view the complete answer paper.

About this paper

This page contains the question paper of SOFTWARE PROCESS AND PROJECT MANAGEMENT from JNTU for MCA 2020 IV, October/ November - 2020, R17.

For the solved question paper with answers, switch to the Answer Paper tab.

Other papers in SOFTWARE PROCESS AND PROJECT MANAGEMENT

Loading Question Papers

Fetching data from database...